Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

New Haven River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 30    Segment ID: T3.01-    Stream Name: Baldwin Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Silt Mix
  Material Type Lower Gravel Mix
  Consistency Upper Cohesive Cohesive
  Consistency Lower Non-cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 607 ft. 199 ft.  
  Erosion Height 2.8 ft. 3.5 ft.  
  Revetment Type Rip-Rap None  
  Revetment Length 662.4 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Coniferous  
  Sub-dominant Deciduous Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 26-50 76-100  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant 26-50 None  
  Length where less than 25 Feet 950 0  
  Buffer Vegetation Type Left Right  
  Dominant Shrubs/Sapling Coniferous  
  Sub-dominant Deciduous Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Shrubs/Sapling Forest  
  Sub-dominant Crop None  
  Mass Failures 41 ft. 38 ft. Multiple
  Average Failure Height 8.0 ft. 15.0 ft. 11.5 ft.
  Gullies 0 None
  Length 0 ft.  
  Average Height