Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 20    Segment ID: M11-    Stream Name: Battenkill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Silt/Clay
  Material Type Lower Silt/Clay
  Consistency Upper Cohesive
  Consistency Lower Cohesive
  Bank Erosion Left Right  
  Erosion Length 0 ft. 0 ft.  
  Erosion Height 0.0 ft. 0.0 ft.  
  Revetment Type Rip-Rap None  
  Revetment Length 283.6 ft. 0.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Shrubs/Sapling Herbaceous  
  Bank Canopy Left Right  
  Canopy Percent 51-75 51-75  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 51-100 26-50  
  Sub-dominant 0-25 0-25  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Deciduous Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Commercial Industrial  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height 0.0 ft.