Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Castleton River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 47    Segment ID: T02.11-s1.04-    Stream Name: Gully Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Mix Mix
  Material Type Lower Mix Mix
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 68 ft. 0 ft.  
  Erosion Height 4.7 ft. 0.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 26.8 ft. 17.3 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 76-100 76-100  
  Mid-Channel Canopy Closed  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant None None  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant None None  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height 0.0 ft.