Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mettowee River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 39    Segment ID: M10-    Stream Name: Mettowee River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Moderate  
  Bank Texture Left Right Old
  Material Type Upper Clay Clay
  Material Type Lower Gravel Gravel
  Consistency Upper Cohesive Cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 175 ft. 0 ft.  
  Erosion Height 2.3 ft. 0.0 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 180.8 ft. 137.2 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Lawn Deciduous  
  Sub-dominant Deciduous None  
  Bank Canopy Left Right  
  Canopy Percent 1-25 76-100  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 >100  
  Sub-dominant >100 0-25  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Deciduous  
  Sub-dominant Deciduous Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Residential Forest  
  Sub-dominant Forest Hay  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height