Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 48    Segment ID: T5.S3.01-    Stream Name: Andover Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Mix Mix
  Material Type Lower Boulder/Cobble Boulder/Cobble
  Consistency Upper Cohesive Cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 710 ft. 465 ft.  
  Erosion Height 6.1 ft. 5.7 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 804.7 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Deciduous Herbaceous  
  Sub-dominant Shrubs/Sapling Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 76-100 76-100  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant 51-100 26-50  
  Length where less than 25 Feet 40 1171  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Herbaceous  
  Sub-dominant Shrubs/Sapling Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Forest  
  Sub-dominant Hay Residential  
  Mass Failures 370 ft. Multiple
  Average Failure Height 42.8 ft. 38.3 ft.
  Gullies 0 None
  Length 0 ft.  
  Average Height