Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook - Basin 13

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 35    Segment ID: T2.03-    Stream Name: Willow Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Mix Mix
  Material Type Lower Gravel Gravel
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 233 ft. 287 ft.  
  Erosion Height 2.6 ft. 3.4 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 167.9 ft. 23.3 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 51-75 26-50  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 0-25  
  Sub-dominant 0-25 >100  
  Length where less than 25 Feet 517 1126  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Shrubs/Sapling Pasture  
  Sub-dominant Forest Shrubs/Sapling  
  Mass Failures None
  Average Failure Height
  Gullies 0 None
  Length 0 ft.  
  Average Height