Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook - Basin 13

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 20    Segment ID: M15-    Stream Name: Mill Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Moderate  
  Bank Texture Left Right Old
  Material Type Upper Mix Mix
  Material Type Lower Mix Mix
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 132 ft. 134 ft.  
  Erosion Height 4.1 ft. 2.6 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 118.6 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Coniferous Herbaceous  
  Sub-dominant Herbaceous Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 76-100 76-100  
  Mid-Channel Canopy Closed  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 26-50  
  Sub-dominant 0-25 51-100  
  Length where less than 25 Feet 32 127  
  Buffer Vegetation Type Left Right  
  Dominant Mixed Trees Herbaceous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Hay  
  Sub-dominant None Residential  
  Mass Failures 59 ft. One
  Average Failure Height 20.0 ft. 20.0 ft.
  Gullies 0 None
  Length 0 ft.  
  Average Height