Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: M29-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Silt Silt
  Material Type Lower Silt Silt
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 3,982 ft. 4,837 ft.  
  Erosion Height 5.5 ft. 5.4 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 1,750.0 ft. 1,771.3 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Shrubs/Sapling  
  Sub-dominant Deciduous Deciduous  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 0-25 >100  
  Sub-dominant >100 0-25  
  Length where less than 25 Feet 9607 2964  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Shrubs/Sapling  
  Sub-dominant Shrubs/Sapling Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Crop Forest  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Mass Failures None
  Average Failure Height
  Gullies None
  Length  
  Average Height