Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Aaron testing new FIT

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: QM.00-    Stream Name: Rock River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope  
  Bank Texture Left Right Old
  Material Type Upper
  Material Type Lower
  Consistency Upper
  Consistency Lower
  Bank Erosion Left Right  
  Erosion Length 0 ft. 0 ft.  
  Erosion Height  
  Revetment Type  
  Revetment Length  
  Near Bank Vegetation Type Left Right  
  Dominant  
  Sub-dominant  
  Bank Canopy Left Right  
  Canopy Percent  
  Mid-Channel Canopy  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant  
  Sub-dominant  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant  
  Sub-dominant  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant  
  Sub-dominant  
  Mass Failures
  Average Failure Height
  Gullies
  Length  
  Average Height