Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

East Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 3    Segment ID: T4.02S2.02-    Stream Name: Royce Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Shallow  
  Bank Texture Left Right Old
  Material Type Upper Silt Silt
  Material Type Lower Clay Clay
  Consistency Upper Cohesive Cohesive
  Consistency Lower Cohesive Cohesive
  Bank Erosion Left Right  
  Erosion Length 196 ft. 356 ft.  
  Erosion Height 2.2 ft. 2.2 ft.  
  Revetment Type None Rip-Rap  
  Revetment Length 0.0 ft. 7.0 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant None None  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 26-50 51-100  
  Sub-dominant 0-25 0-25  
  Length where less than 25 Feet 1329 1397  
  Buffer Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant Shrubs/Sapling None  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Hay Hay  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
  Mass Failures None
  Average Failure Height
  Gullies 0 None
  Length 0 ft.  
  Average Height