Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Mid, Alder to Montp

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 2    Segment ID: M02.02-    Stream Name: Little River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Sand Sand
  Material Type Lower Gravel Gravel
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 431 ft. 179 ft.  
  Erosion Height 3.3 ft. 3.8 ft.  
  Revetment Type Rip-Rap Rip-Rap  
  Revetment Length 121.8 ft. 64.6 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Shrubs/Sapling Deciduous  
  Sub-dominant Deciduous Shrubs/Sapling  
  Bank Canopy Left Right  
  Canopy Percent 51-75 76-100  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant >100 >100  
  Sub-dominant None 26-50  
  Length where less than 25 Feet 0 0  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Shrubs/Sapling  
  Sub-dominant Shrubs/Sapling Deciduous  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Forest Shrubs/Sapling  
  Sub-dominant Shrubs/Sapling Residential  
  Mass Failures None
  Average Failure Height
  Gullies 0 None
  Length 0 ft.  
  Average Height