Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Lower - LC up to Alder

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: R01-    Stream Name: Winooski

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Riparian Banks, Buffers, and Corridors  
3.1 Stream Banks  
  Typical Bank Slope Steep  
  Bank Texture Left Right Old
  Material Type Upper Clay Clay
  Material Type Lower Sand Sand
  Consistency Upper Non-cohesive Non-cohesive
  Consistency Lower Non-cohesive Non-cohesive
  Bank Erosion Left Right  
  Erosion Length 4,173 ft. 6,633 ft.  
  Erosion Height 10.4 ft. 0.0 ft.  
  Revetment Type Rip-Rap Multiple  
  Revetment Length 1,370.3 ft. 3,059.5 ft.  
  Near Bank Vegetation Type Left Right  
  Dominant Herbaceous Herbaceous  
  Sub-dominant Bare Bare  
  Bank Canopy Left Right  
  Canopy Percent 1-25 1-25  
  Mid-Channel Canopy Open  
3.2 Riparian Buffer  
  Buffer Width Left Right  
  Dominant 26-50 26-50  
  Sub-dominant >100 >100  
  Length where less than 25 Feet  
  Buffer Vegetation Type Left Right  
  Dominant Deciduous Deciduous  
  Sub-dominant Shrubs/Sapling Shrubs/Sapling  
3.3 Riparian Corridor  
  Corridor Land Use Left Right Old
  Dominant Crop Crop  
  Sub-dominant Forest Forest  
  Mass Failures None
  Average Failure Height 0.0 ft. 0.0 ft. 0.0 ft.
  Gullies None
  Length  
  Average Height 0.0 ft.