Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 51    Segment ID: R44T6.01-    Stream Name: Burgess Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 81 ft.
2.2 Maximum Depth 4.8 ft.
2.3 Mean Depth 3.7 ft.
2.4 Floodprone Width 105 ft.
2.5 Recently Abandoned Floodplain 5.8 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 22.1
2.7 Entrenchment Ratio 1.3
2.8 Incision Ratio - Redently Abandoned Floodplain 1.2
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Sedimented
2.11 Riffle/Step Spacing Distance 122 ft.
2.12 Substrate Composition  
  Bedrock 1.0 %
  Boulder 10.0 %
  Cobble 49.0 %
  Course Gravel 13.0 %
  Fine Gravel 11.0 %
  Sand 16.0 %
  Silt and smaller 0.0 %
  Clay Present? No
  Percent Detritus 5.0 %
  Large Woody Debris Count 62
2.13 Average Largest Particle On  
  Bed 27.6 inches
  Bar Not Applicable
2.14 Phase 2 Stream Type  
  Stream Type B
  Bed Material Cobble
  Subclass Slope c
  Dominant Bed Form Riffle-Pool
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type C
  Dominant Bed Material Gravel
  Subclass Slope None
  Bed Form Riffle-Pool
  Sub-reach Stream Type  
  Reference Stream Type B
  Reference Bed Material Cobble
  Reference Subclass Slope c
  Reference Bedform Riffle-Pool