Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M01-    Stream Name: main stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 31 ft.
2.2 Maximum Depth 2.6 ft.
2.3 Mean Depth 1.7 ft.
2.4 Floodprone Width 70 ft.
2.5 Recently Abandoned Floodplain 4.6 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 18.2
2.7 Entrenchment Ratio 2.3
2.8 Incision Ratio - Redently Abandoned Floodplain 1.8
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Complete
2.11 Riffle/Step Spacing Distance 250 ft.
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 30.0 %
  Cobble 36.0 %
  Course Gravel 13.0 %
  Fine Gravel 9.0 %
  Sand 12.0 %
  Silt and smaller 0.0 %
  Clay Present? Yes
  Percent Detritus 2.0 %
  Large Woody Debris Count 3
2.13 Average Largest Particle On  
  Bed 15 inches
  Bar 10 inches
2.14 Phase 2 Stream Type  
  Stream Type C
  Bed Material Cobble
  Subclass Slope None
  Dominant Bed Form Riffle-Pool
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type C
  Dominant Bed Material Cobble
  Subclass Slope None
  Bed Form Riffle-Pool
  Sub-reach Stream Type  
  Reference Stream Type
  Reference Bed Material
  Reference Subclass Slope
  Reference Bedform