Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Sunderland Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M01-    Stream Name: Sunderland Main Stem

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 22 ft.
2.2 Maximum Depth 4.2 ft.
2.3 Mean Depth 2.7 ft.
2.4 Floodprone Width 100 ft.
2.5 Recently Abandoned Floodplain 8.1 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 8.3
2.7 Entrenchment Ratio 4.5
2.8 Incision Ratio - Redently Abandoned Floodplain 1.9
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Not Applicable
2.11 Riffle/Step Spacing Distance Not Applicable
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 0.0 %
  Cobble 0.0 %
  Course Gravel 0.0 %
  Fine Gravel 0.0 %
  Sand 100.0 %
  Silt and smaller 0.0 %
  Clay Present? Yes
  Percent Detritus 7.0 %
  Large Woody Debris Count 38
2.13 Average Largest Particle On  
  Bed 0.1 inches
  Bar 0.1 inches
2.14 Phase 2 Stream Type  
  Stream Type E
  Bed Material Sand
  Subclass Slope
  Dominant Bed Form Plane Bed
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type E
  Dominant Bed Material Sand
  Subclass Slope
  Bed Form Dune-Ripple
  Sub-reach Stream Type  
  Reference Stream Type
  Reference Bed Material
  Reference Subclass Slope
  Reference Bedform