Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 54    Segment ID: T4.01-    Stream Name: Jenkins Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 38 ft.
2.2 Maximum Depth 2.9 ft.
2.3 Mean Depth 1.6 ft.
2.4 Floodprone Width 72 ft.
2.5 Recently Abandoned Floodplain 5.5 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 23.9
2.7 Entrenchment Ratio 1.9
2.8 Incision Ratio - Redently Abandoned Floodplain 1.9
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Moderate
2.10 Type of Riffles Sedimented
2.11 Riffle/Step Spacing Distance 53 ft.
2.12 Substrate Composition  
  Bedrock 5.0 %
  Boulder 29.0 %
  Cobble 32.0 %
  Course Gravel 2.0 %
  Fine Gravel 12.0 %
  Sand 20.0 %
  Silt and smaller 0.0 %
  Clay Present? No
  Percent Detritus 5.0 %
  Large Woody Debris Count 114
2.13 Average Largest Particle On  
  Bed 12.5 inches
  Bar 10.4 inches
2.14 Phase 2 Stream Type  
  Stream Type B
  Bed Material Cobble
  Subclass Slope a
  Dominant Bed Form Step-Pool
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type B
  Dominant Bed Material Cobble
  Subclass Slope a
  Bed Form Step-Pool
  Sub-reach Stream Type  
  Reference Stream Type
  Reference Bed Material
  Reference Subclass Slope
  Reference Bedform
  Were Channel Dimensions Significantly Changed By Major Flooding No
  Were channel dimensions significantly changed by human alteration associated with flood recovery efforts (e.g., reshaping of banks by yellow machines)? No
  Channel Enlargement 0 %
  Comments