Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 61    Segment ID: T5.01-    Stream Name: Munson Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 22 ft.
2.2 Maximum Depth 2.1 ft.
2.3 Mean Depth 1.2 ft.
2.4 Floodprone Width 31 ft.
2.5 Recently Abandoned Floodplain 5.9 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 18.3
2.7 Entrenchment Ratio 1.4
2.8 Incision Ratio - Redently Abandoned Floodplain 2.8
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Moderate
2.10 Type of Riffles Not Applicable
2.11 Riffle/Step Spacing Distance Not Applicable
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 1.0 %
  Cobble 45.0 %
  Course Gravel 12.0 %
  Fine Gravel 12.0 %
  Sand 30.0 %
  Silt and smaller 0.0 %
  Clay Present? Yes
  Percent Detritus 0.0 %
  Large Woody Debris Count 0
2.13 Average Largest Particle On  
  Bed 483 mm
  Bar
2.14 Phase 2 Stream Type  
  Stream Type F
  Bed Material Cobble
  Subclass Slope None
  Dominant Bed Form Plane Bed
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type C
  Dominant Bed Material Cobble
  Subclass Slope a
  Bed Form Plane Bed
  Sub-reach Stream Type  
  Reference Stream Type F
  Reference Bed Material Cobble
  Reference Subclass Slope None
  Reference Bedform Plane Bed