Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 59    Segment ID: T4S1.01-    Stream Name: Bromley Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 48 ft.
2.2 Maximum Depth 2.6 ft.
2.3 Mean Depth 1.4 ft.
2.4 Floodprone Width 200 ft.
2.5 Recently Abandoned Floodplain 3.1 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 35.3
2.7 Entrenchment Ratio 4.2
2.8 Incision Ratio - Redently Abandoned Floodplain 1.2
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Eroded
2.11 Riffle/Step Spacing Distance Not Applicable
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 5.0 %
  Cobble 37.0 %
  Course Gravel 30.0 %
  Fine Gravel 23.0 %
  Sand 5.0 %
  Silt and smaller 0.0 %
  Clay Present? Yes
  Percent Detritus 2.0 %
  Large Woody Debris Count 0
2.13 Average Largest Particle On  
  Bed 426 mm
  Bar
2.14 Phase 2 Stream Type  
  Stream Type C
  Bed Material Gravel
  Subclass Slope None
  Dominant Bed Form Plane Bed
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type C
  Dominant Bed Material Gravel
  Subclass Slope
  Bed Form Riffle-Pool
  Sub-reach Stream Type  
  Reference Stream Type
  Reference Bed Material
  Reference Subclass Slope
  Reference Bedform