Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Mill Brook - Basin 13

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 23    Segment ID: M16-    Stream Name: Mill Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 19 ft.
2.2 Maximum Depth 1.6 ft.
2.3 Mean Depth 1.3 ft.
2.4 Floodprone Width 22 ft.
2.5 Recently Abandoned Floodplain 4.6 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 14.1
2.7 Entrenchment Ratio 1.2
2.8 Incision Ratio - Redently Abandoned Floodplain 2.8
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Sedimented
2.11 Riffle/Step Spacing Distance 120 ft.
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 7.0 %
  Cobble 55.0 %
  Course Gravel 18.0 %
  Fine Gravel 10.0 %
  Sand 1.0 %
  Silt and smaller 0.0 %
  Clay Present? Yes
  Percent Detritus 4.0 %
  Large Woody Debris Count 21
2.13 Average Largest Particle On  
  Bed 300 mm
  Bar 150 mm
2.14 Phase 2 Stream Type  
  Stream Type F
  Bed Material Cobble
  Subclass Slope None
  Dominant Bed Form Plane Bed
  SubDominant Bed Form Riffle-Pool
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type B
  Dominant Bed Material Cobble
  Subclass Slope None
  Bed Form Riffle-Pool
  Sub-reach Stream Type  
  Reference Stream Type C
  Reference Bed Material Cobble
  Reference Subclass Slope None
  Reference Bedform Riffle-Pool
  Were Channel Dimensions Significantly Changed By Major Flooding No
  Were channel dimensions significantly changed by human alteration associated with flood recovery efforts (e.g., reshaping of banks by yellow machines)? No
  Channel Enlargement 0 %
  Comments