Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

West River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 39    Segment ID: T11.05-    Stream Name: Winhall River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Stream Channel  
2.1 Bankfull Width 77 ft.
2.2 Maximum Depth 3.1 ft.
2.3 Mean Depth 2.0 ft.
2.4 Floodprone Width 226 ft.
2.5 Recently Abandoned Floodplain 4.7 ft.
  Human Elevated Floodplain ft.
2.6 Width/Depth Ratio 39.0
2.7 Entrenchment Ratio 3.0
2.8 Incision Ratio - Redently Abandoned Floodplain 1.5
  Incision Ratio - Human Elevated FloodPlain 0.0
2.9 Sinuosity Low
2.10 Type of Riffles Sedimented
2.11 Riffle/Step Spacing Distance 334.2 ft.
2.12 Substrate Composition  
  Bedrock 0.0 %
  Boulder 7.0 %
  Cobble 31.0 %
  Course Gravel 36.0 %
  Fine Gravel 16.0 %
  Sand 10.0 %
  Silt and smaller 0.0 %
  Clay Present? No
  Percent Detritus 0.0 %
  Large Woody Debris Count 7
2.13 Average Largest Particle On  
  Bed 9.2 inches
  Bar 5 inches
2.14 Phase 2 Stream Type  
  Stream Type C
  Bed Material Gravel
  Subclass Slope None
  Dominant Bed Form Riffle-Pool
  SubDominant Bed Form
  Field Measured Slope
  Phase 1 Stream Type  
  Stream Type C
  Dominant Bed Material Cobble
  Subclass Slope None
  Bed Form Riffle-Pool
  Sub-reach Stream Type  
  Reference Stream Type
  Reference Bed Material
  Reference Subclass Slope
  Reference Bedform
  Were Channel Dimensions Significantly Changed By Major Flooding No
  Were channel dimensions significantly changed by human alteration associated with flood recovery efforts (e.g., reshaping of banks by yellow machines)? No
  Channel Enlargement 0 %
  Comments