Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Otter Creek - Cold River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M01-    Stream Name: Cold River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments Also Substrate Size, Planform and Slope and Depositional Features are different than in Segment B.  
1.2 Alluvial Fan Yes  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 357 ft. 0 ft. 8.5 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Flat Flat  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Never Sometimes  
  Texture Sand Sand  
1.5 Valley Features
  Valley Width 1,098 ft.  
  Valley Width Determination Estimated  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls