Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 9    Segment ID: R28T1.05-    Stream Name: Jay Branch

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Depositional Features  
  Comments CD/SS/DF  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 1,715 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 89 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Flat Steep  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Never Sometimes  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 830 ft.  
  Valley Width Determination Estimated  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls