Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Missisquoi

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 67    Segment ID: R47S2.01-    Stream Name: Unnamed-2 to Missisquoi-R47

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments also due to more depositional features downstream and valley walls narrower upstream. Banks and buffers are more forested upstream as well.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 55 ft. 0 ft. 0.0 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 53 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Hilly Hilly  
  Continuous with Bank? Never Never  
  Within 1 Bankfull Width? Never Never  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 204 ft.  
  Valley Width Determination Measured  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data