Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Clyde

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 10    Segment ID: T1.08-    Stream Name: Outflow from Echo and Seymour Lakes

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments lower portion of reach influenced by recent beaver dam ponds, draining  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0.0 ft.
  Road Length 101 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0.0 ft.
  Development Length 103 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope  
  Continuous with Bank?  
  Within 1 Bankfull Width?  
  Texture  
1.5 Valley Features
  Valley Width 130 ft.  
  Valley Width Determination Estimated  
  Confinement Type NW  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls