Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

North Branch Winooski

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 9    Segment ID: M08-    Stream Name: North Branch Winooski River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Corridor Encroachment  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 0 ft. 277 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 81 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Steep Hilly  
  Continuous with Bank? Sometimes Sometimes  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Sand Sand  
1.5 Valley Features
  Valley Width 600 ft.  
  Valley Width Determination Estimated  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls