Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Poultney Tribs

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 16    Segment ID: M08-S1.06-    Stream Name: Lewis Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 133 ft. 0 ft. 0.0 ft.
  Road Length 3 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 2,710 ft. 0 ft. 0.0 ft.
  Development Length 55 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Very Steep Very Steep  
  Continuous with Bank? Sometimes Sometimes  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 89 ft.  
  Valley Width Determination Measured  
  Confinement Type SC  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data
TypeTotal Height (ft.)Height Above Water (ft.)Photo Taken?GSP Taken?
Ledge52  
Waterfall202  
Ledge52  
Ledge51  
Ledge42  
Ledge00  
Waterfall83  
Waterfall76