Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill - White Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: M03-    Stream Name: White Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Planform and Scope  
  Comments Segment M03-B had less sinuosity, narrower, and steeper then Seg A.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 5,036 ft. 0 ft. RH1=7.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Very Steep Very Steep  
  Continuous with Bank? Sometimes Never  
  Within 1 Bankfull Width? Sometimes Never  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 259 ft.  
  Valley Width Determination Estimated  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls There are no grade controls