Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Browns River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 22    Segment ID: M15-    Stream Name: Browns River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Other Reason  
  Comments back water from impoundment  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0.0 ft.
  Road Length RH1=0.0 ft.
  Railroad Length 0.0 ft.
  Improved Path Length 0.0 ft.
  Development Length  
  Left Corridor (Old) Right Corridor (Old)  
  Berm Length 0 ft. 0 ft.  
  Road Length 0 ft. 0 ft.  
  Railroad Length 0 ft. 0 ft.  
  Improved Path Length 0 ft. 0 ft.  
  Development Length 0 ft. 100 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Hilly Steep  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Never Sometimes  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 1,500 ft.  
  Valley Width Determination  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
 
1.6 Grade Controls No Data