Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Stevens River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: T1.02-    Stream Name: Peacham Hollow Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Valley Width  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 840 ft. 0 ft. 8.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Very Steep Very Steep  
  Continuous with Bank? Sometimes Sometimes  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Cobble Cobble  
1.5 Valley Features
  Valley Width 150 ft.  
  Valley Width Determination Estimated  
  Confinement Type SC  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls