Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Morehouse Brook

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 6    Segment ID: T1.01-    Stream Name: Main Trib to Morehouse Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0.0 ft.
  Road Length RH1=0.0 ft.
  Railroad Length 0.0 ft.
  Improved Path Length 0.0 ft.
  Development Length  
  Left Corridor (Old) Right Corridor (Old)  
  Berm Length 0 ft. 0 ft.  
  Road Length 0 ft. 0 ft.  
  Railroad Length 0 ft. 0 ft.  
  Improved Path Length 0 ft. 0 ft.  
  Development Length 150 ft. 150 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Hilly Hilly  
  Continuous with Bank? Sometimes Sometimes  
  Within 1 Bankfull Width? Always Always  
  Texture Sand Sand  
1.5 Valley Features
  Valley Width 60 ft.  
  Valley Width Determination Measured  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls