Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

White River - First Branch

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 64    Segment ID: T7.01-    Stream Name: Jones Pond Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Planform and Scope  
  Comments Subreach, steeper than DS segments.Reach was broken into 5 segments: T701A-B3a Step-pool, 6067 ft, 5.2 pct slope (GIS); T701B-C4b Riffle-pool, 3163 ft, 3.2 pct slope (GIS); T701C-C5 Riffle-pool, 726 ft, 1.7 pct slope (GIS); T701D-C4b Riffle-pool, 2388 ft, 3.1 pct slope (GIS); T701E-E5b Riffle-pool, 805 ft, 3.4 pct slope (GIS); T701F-C4a Riffle-pool, 804 ft, 7.1 pct slope (GIS). T701A designated reference reach due to longest length.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 571 ft. 174 ft. RH1=8.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 210 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Extremely Steep Extremely Steep  
  Continuous with Bank? Sometimes Sometimes  
  Within 1 Bankfull Width? Always Sometimes  
  Texture Mixed Mixed  
1.5 Valley Features
  Valley Width 50 ft.  
  Valley Width Determination Measured  
  Confinement Type SC  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls There are no grade controls