Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 21    Segment ID: M11-    Stream Name: Battenkill River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Other Reason  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 465 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 1,565 ft. 322 ft.  
  Left Corridor (Old) Right Corridor (Old)  
  Berm Length 0 ft. 0 ft.  
  Road Length 0 ft. 0 ft.  
  Railroad Length 0 ft. 0 ft.  
  Improved Path Length 0 ft. 0 ft.  
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Steep Steep  
  Continuous with Bank? Sometimes Always  
  Within 1 Bankfull Width? Sometimes Always  
  Texture Cobble Cobble  
1.5 Valley Features
  Valley Width 308 ft.  
  Valley Width Determination Measured  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
yes  
1.6 Grade Controls No Data