Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 56    Segment ID: T4.02-    Stream Name: Bourne Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments  
1.2 Alluvial Fan Yes  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 128 ft. 1,008 ft. 0.0 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 1,504 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Hilly Hilly  
  Continuous with Bank? Always Always  
  Within 1 Bankfull Width? Always Always  
  Texture Cobble Cobble  
1.5 Valley Features
  Valley Width 600 ft.  
  Valley Width Determination Measured  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
yes  
1.6 Grade Controls There are no grade controls