Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Battenkill River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 55    Segment ID: T4.01-    Stream Name: Bourne Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments  
1.2 Alluvial Fan Yes  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 1,841 ft. 2,007 ft. 0.0 ft.
  Road Length 448 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 2,029 ft. 748 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Flat Flat  
  Continuous with Bank? Always Always  
  Within 1 Bankfull Width? Always Always  
  Texture Cobble Cobble  
1.5 Valley Features
  Valley Width 450 ft.  
  Valley Width Determination Measured  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data