Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 39    Segment ID: T5.S1.04-    Stream Name: South Branch Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments Segment A has a reference stream type of B where segment B has a reference stream type of C  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 2,038 ft. 0 ft. RH1=10.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 165 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Flat Very Steep  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Sometimes Always  
  Texture Gravel Cobble  
1.5 Valley Features
  Valley Width 650 ft.  
  Valley Width Determination Measured  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls No Data