Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 51    Segment ID: T5.S3.04-    Stream Name: Andover Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments Segment A exhibits F-type channel dimensions. The segment alternated between a narrow channel with berms and a widened channel with a disconnected floodplain.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 544 ft. 0 ft. 2.8 ft.
  Road Length 1,895 ft. 0 ft. RH1=10.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Steep Very Steep  
  Continuous with Bank? Never Never  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Mixed Mixed  
1.5 Valley Features
  Valley Width 175 ft.  
  Valley Width Determination Measured  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls There are no grade controls