Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 21    Segment ID: M22-    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments  
1.2 Alluvial Fan Yes  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 496 ft. 0 ft. 4.3 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 77 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Hilly Hilly  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Mixed Mixed  
1.5 Valley Features
  Valley Width 275 ft.  
  Valley Width Determination Measured  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data
TypeTotal Height (ft.)Height Above Water (ft.)Photo Taken?GSP Taken?
Ledge00No 
Ledge42No 
Ledge10No 
Ledge64Yes