Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Williams River

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 15    Segment ID: M19-    Stream Name: Williams River

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments Segment A is reference Ab with bedrock banks on both sides, while segment B is reference B departed to F with only one bedrock bank.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 3,862 ft. 0 ft. RH1=15.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 207 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Very Steep Extremely Steep  
  Continuous with Bank? Sometimes Always  
  Within 1 Bankfull Width? Always Always  
  Texture Bedrock Bedrock  
1.5 Valley Features
  Valley Width 80 ft.  
  Valley Width Determination Measured  
  Confinement Type NC  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls No Data
TypeTotal Height (ft.)Height Above Water (ft.)Photo Taken?GSP Taken?
Ledge10Yes 
Ledge10Yes 
Ledge00No 
Ledge00No 
Ledge21Yes 
Ledge63Yes 
Ledge25Yes 
Ledge21No 
Ledge00No 
Ledge00No 
Ledge20No 
Ledge10No 
Ledge63Yes 
Ledge53Yes 
Ledge00No 
Ledge00No 
Ledge10No 
Ledge10No 
Ledge73Yes 
Ledge10Yes 
Ledge31Yes 
Ledge10Yes 
Ledge20No 
Ledge20No 
Ledge20No 
Ledge10Yes 
Ledge00No 
Ledge00No 
Ledge00No 
Ledge00No 
Ledge42Yes 
Ledge00No 
Ledge53Yes 
Ledge51Yes 
Ledge72Yes 
Ledge10Yes 
Ledge10Yes