Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Upper Otter Creek

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 1    Segment ID: M18-    Stream Name: Upper Otter Creek

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 2,235 ft. 0 ft. RH1=15.0 ft.
  Railroad Length 4,443 ft. 556 ft. 22.5 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 1,720 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Steep Steep  
  Continuous with Bank? Sometimes Never  
  Within 1 Bankfull Width? Sometimes Never  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 2,750 ft.  
  Valley Width Determination Measured  
  Confinement Type VB  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
Yes  
1.6 Grade Controls There are no grade controls