Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Mid, Alder to Montp

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 17    Segment ID: R10.S3.04-    Stream Name: Joiner Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Channel Dimensions  
  Comments Segment C is incised, while Segments B and D are not incised.  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Extremely Steep Extremely Steep  
  Continuous with Bank? Never Never  
  Within 1 Bankfull Width? Sometimes Sometimes  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 325 ft.  
  Valley Width Determination Measured  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data