Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Mid, Alder to Montp

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 14    Segment ID: R10.S3.03-    Stream Name: Joiner Brook

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation Grade Controls  
  Comments Segmentation also due to change in valley width  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 0 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Extremely Steep Very Steep  
  Continuous with Bank? Always Sometimes  
  Within 1 Bankfull Width? Always Always  
  Texture Not Evaluated Not Evaluated  
1.5 Valley Features
  Valley Width 110 ft.  
  Valley Width Determination Measured  
  Confinement Type SC  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls No Data
TypeTotal Height (ft.)Height Above Water (ft.)Photo Taken?GSP Taken?
Waterfall83Yes 
Waterfall95Yes 
Waterfall1510Yes 
Waterfall128Yes 
Waterfall2515Yes