Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Winooski Lower - LC up to Alder

Return to Segment List   Step 0Step 1Step 2Step 3Step 4Step 5Step 6Step 7QA CheckMap


Record: 5    Segment ID: R04-    Stream Name: Winooski

Go to First  Go to Prev  Go to Next  Go to Last  ChangeLog

Valley and Floodplain Corridor
1.1 Segmentation None  
  Comments  
1.2 Alluvial Fan None  
1.3 River Corridor Encroachments
  One Side (New) Both Sides (New) Average Height
  Berm Length 0 ft. 0 ft. 0.0 ft.
  Road Length 2,687 ft. 0 ft. RH1=0.0 ft.
  Railroad Length 0 ft. 0 ft. 0.0 ft.
  Improved Path Length 0 ft. 0 ft. 0.0 ft.
  Development Length 2,593 ft. 156 ft.  
  Left Corridor (Old) Right Corridor (Old)  
  Berm Length 0 ft. 0 ft.  
  Road Length 1,378 ft. 520 ft.  
  Railroad Length 0 ft. 0 ft.  
  Improved Path Length 0 ft. 0 ft.  
  Development Length 0 ft. 0 ft.  
1.4 Adjacent Terrace or Hillside
  Left Corridor Right Corridor  
  Slope Steep Steep  
  Continuous with Bank? Never Sometimes  
  Within 1 Bankfull Width? Never Sometimes  
  Texture Not Evaluated Sand  
1.5 Valley Features
  Valley Width 4,375 ft.  
  Valley Width Determination Estimated  
  Confinement Type BD  
  Segment in a rock gorge? No  
  Human-caused change
in valley width?
No  
1.6 Grade Controls There are no grade controls