Skip Navigation LinksHome > Projects List > Phase 2 > Data Entry

Segment Versions Comparision
Compare Version 2020 Update VT and QC For Segment M10-0 to   

Field NameValue 1Value 2Different?
ProjectNameRock RiverRock River 
StreamNameRock RiverRock River 
ProjectID5454 
ReachID5858 
SegmentID00 
ReachPointIDM10M10 
OrganizationID 6Different
OrganizationName South Mountain Research & ConsultingDifferent
ObserversJHB, FCPBJ, BOSDifferent
IsNotAssessedFalseFalse 
WhyNotAssessed   
IsAdminJudgementFalseFalse 
SegmentLocationEast of and parallel to Hanna RoadEast of and parallel to Hanna Road 
SegmentLength60786078 
CompletionDate7/28/2020 12:00:00 AM6/27/2006 12:00:00 AMDifferent
SevenDayRainNoYesDifferent
WeatherHot and drypartly sunny, 80, some rainDifferent
KnownFloodHistoryNoYesDifferent
SketchDoneYesYes 
PhotoLogDoneYesYes 
WatershedZone   
ReachClearlyAffectedByMajorFloodingNo Different
AdminJudgementEntity   
StreamTypeECDifferent
BedformPlane BedRiffle-PoolDifferent
BedMaterialSiltSandDifferent
SubclassSlope cDifferent
GeoAssessConditionFairGoodDifferent
AdminStreamTypeDeparture   
Segmentation NoneDifferent
SegmentationComment   
BermLength_1432.7211432.72Different
BermLength_2245.6753245.68Different
RoadLength_100 
RoadLength_200 
RailroadLength_100 
RailroadLength_200 
PathLength_100 
PathLength_200 
DevelopmentLength_1118.5567118.56Different
DevelopmentLength_270.885270.89Different
BermLength_L   
BermLength_R   
RoadLength_L   
RoadLength_R   
RailroadLength_L   
RailroadLength_R   
PathLength_L   
PathLength_R   
HillsideSlope_LFlatHillyDifferent
HillsideSlope_RHillyVery SteepDifferent
HillsideContinuous_LNeverSometimesDifferent
HillsideContinuous_RSometimesSometimes 
HillsideInWidth_LNeverSometimesDifferent
HillsideInWidth_RSometimesSometimes 
HillsideTexture_LMixedNot EvaluatedDifferent
HillsideTexture_RMixedBedrockDifferent
ValleyWidth90200Different
ValleyWidthDeterminationMeasuredEstimatedDifferent
ConfinementTypeBDVBDifferent
InRockGorgeNoNo 
HumanChangedWidthNoYesDifferent
BankfullWidth8.915.7Different
MaximumDepth1.81.9Different
MeanDepth1.20.95Different
FloodproneWidth30160Different
RecentlyAbandonedFloodplain2.52.2Different
HumanElevatedFloodplain   
SinuosityTypeModerateModerate 
RifflesTypeSedimentedCompleteDifferent
IsRiffleSpacingApplicable   
RiffleSpacingDistance 120Different
Bedrock00 
Boulder00 
Cobble01Different
Course Gravel1032Different
Fine Gravel1514Different
Sand2553Different
Silt or Smaller500Different
SiltClayPresentYesYes 
DetritusPercent05Different
WoodyDebrisNumber524Different
IsBarBedParticleNotEvaluatedFalseFalse 
IsBedParticleNotApplicableFalseFalse 
LargestBedParticle 47Different
IsBarParticleNotApplicableFalseTrueDifferent
LargestBarParticle   
ParticleUnits mmDifferent
StreamType1ECDifferent
BedMaterial1SiltSandDifferent
SubclassSlope1 cDifferent
SubBedForm   
FieldMeasuredSlope   
ReferenceStreamType   
ReferenceBedMaterial   
ReferenceSubclassSlope   
ReferenceBedform   
ReachClearlyAffectedByMajorFlooding1No Different
WereChannelDimensionsSignificantlyChangedByMajorFlooding   
WereChannelDimensionsSignificantlyChangedByHumansInReponseToMajorFlooding   
ChannelEnlargement00 
FloodAffectedCrossSectionCommentsNULL Different
TypicalBankSlopeSteepModerateDifferent
MaterialTypeUpper_LMixClayDifferent
MaterialTypeUpper_RMixClayDifferent
MaterialTypeUpper   
MaterialTypeLower_LSiltClayDifferent
MaterialTypeLower_RSiltClayDifferent
MaterialTypeLower   
ConsistencyUpper_LCohesiveCohesive 
ConsistencyUpper_RCohesiveCohesive 
ConsistencyUpper   
ConsistencyLower_LCohesiveCohesive 
ConsistencyLower_RCohesiveCohesive 
ConsistencyLower   
BankErosionLength_L435.3965435.4Different
BankErosionLength_R447.7103434.9Different
BankErosionHeight_L11 
BankErosionHeight_R1.0286150Different
BankRevetmentType_LNoneNone 
BankRevetmentType_RNoneNone 
BankRevetmentLength_L00 
BankRevetmentLength_R00 
DominantBankVegetation_LHerbaceousDeciduousDifferent
DominantBankVegetation_RHerbaceousDeciduousDifferent
SubDomBankVegetation_LConiferousNoneDifferent
SubDomBankVegetation_RConiferousNoneDifferent
CanopyPercentCategory_L26-5051-75Different
CanopyPercentCategory_R26-5051-75Different
ChannelCanopyOpenOpen 
DominantBufferWidth_L>10026-50Different
DominantBufferWidth_R>100>100 
SubDomBufferWidth_L0-250-25 
SubDomBufferWidth_R0-250-25 
Buffer0to25Feet_L622 Different
Buffer0to25Feet_R201 Different
DominantBufferVegetation_LHerbaceousHerbaceous 
DominantBufferVegetation_RHerbaceousDeciduousDifferent
SubDomBufferVegetation_LConiferousNoneDifferent
SubDomBufferVegetation_RConiferousHerbaceousDifferent
DominantLandUse_LPastureHayDifferent
DominantLandUse_RForestForest 
SubDomLandUse_LCropPastureDifferent
SubDomLandUse_RPastureNoneDifferent
MassFailuresLength_L   
MassFailuresLength_R   
MassFailuresNoneNone 
MassFailuresMeanHeight_L 0Different
MassFailuresMeanHeight_R 0Different
FailureMeanHeight 0Different
GulliesNumber0 Different
GulliesNoneNone 
GulliesLength0 Different
GullyMeanHeight 0Different
SpringSeepAbundantMinimalDifferent
AdjacentWetlandAbundantMinimalDifferent
FlowStatusModerateModerate 
DebrisJamsNumber30Different
FlowRegTypeNoneNone 
FlowRegUse   
Impoundments NoneDifferent
ImpoundmentLocation   
FlowRegUpDownStreamNone Different
UpstreamFlowRegulation NoneDifferent
IsNoChannelConstrictionFalseFalse 
BeaverDamsNumber00 
BeaverDamAffectedLength00 
BridgeCulvertAssessmentYesNoDifferent
BarMidNumber 0Different
BarPointNumber 0Different
BarSideNumber20Different
BarDiagonalNumber 0Different
BarDeltaNumber 0Different
BarIslandNumber 0Different
FloodChutesNumber00 
NeckCutoffsNumber00 
ChannelAvulsionsNumber00 
BraidingNumber00 
SteepRifflesNumber00 
HeadCutsNumber00 
TributaryRejuvenationNoNo 
StraighteningWith Windrowing StraighteningDifferent
StraighteningLength2027.5762027.6Different
DredgingDredgingDredging 
Comments Human-caused reduction in valley width (1.5) is at downstream extent of reach, caused by Hanna Rd (outside of Phase 2 belt-width-derived corridor used to assess Step 1.3). Direct-pasture access mid-reach. FIT locations are approximate only since 1995 surface water coverage does not match current planform - particularly at culvert crossing at upstream extent, where stream has been recently channelized.Different
rhaStreamTypeRiffle-Pool Different
rhaDepartureTypePlane Bed Different
rhacomments   
HabAssessStreamType HighDifferent
GeoAssessConfinementUnconfinedUnconfined 
ChannelEvolutionStageIIIIIDifferent
ChannelEvolutionModelFDDifferent
GeoAssessCondition1FairGoodDifferent
GeoAssessSensitivityExtremeHighDifferent
AdjustmentNarrativeThe reach has extensive historic straightening and is slowly starting to move towards widening and planform adjustment. We selected Stage II due to moderate incision and limited evidence of active widening, likely due to low channel slope. The reach has good buffers and is a good candidate for restoration and/or easements. Minor adjustments in response to channelization and limited berming. Adjustments probably moderated by cohesive boundary conditions (silts/clays) and relatively low stream power due to limited drainage area. Also bedrock grade controls.Different
ReachesRID26432643 
SegmentsRID36051227Different
VersionName2020 Update VT and QCBaseDifferent