Skip Navigation LinksHome > Projects List > Phase 1 >

Bartlett Brook

Data stored from FIT file

Return to File List

Version: 4.56

ReachPhaseImpactSub ImpactLocationLength (ft.)Name 1Value 1Name 2Value 2
T1.01-A2Bank Armoring or RevetmentRip-RapLeft Bank49.91-----0-----0
T1.01-A2Bank Armoring or RevetmentRip-RapLeft Bank55.28-----0-----0
T1.01-A2Bank Armoring or RevetmentRip-RapRight Bank55.43-----0-----0
T1.01-A2Bank Armoring or RevetmentRip-RapRight Bank70.44-----0-----0
T1.01-A2Bridge or CulvertCulvert 0Length120-----0
T1.01-A2Buffers Less than 25 feet Right Bank49.92-----0-----0
T1.01-A2Debris Jam  0-----0-----0
T1.01-A2Debris Jam  0-----0-----0
T1.01-A2Erosion Left Bank34.65Height3-----0
T1.01-A2Erosion Left Bank36.26Height3-----0
T1.01-A2Erosion Left Bank39.18Height3-----0
T1.01-A2Erosion Left Bank43.36Height4-----0
T1.01-A2Erosion Left Bank48.4Height3-----0
T1.01-A2Erosion Right Bank13.98Height3-----0
T1.01-A2Erosion Right Bank34.3Height3-----0
T1.01-A2Erosion Right Bank40.78Height5-----0
T1.01-A2Erosion Right Bank42.01Height3-----0
T1.01-A2Mass Failure Left Bank25.57Height7-----0
T1.01-A2Mass Failure Left Bank35.84Height15-----0
T1.01-A2MigrationFlood Chute 0-----0-----0
T1.01-A2MigrationFlood Chute 0-----0-----0
T1.01-A2MigrationFlood Chute 0-----0-----0
T1.01-A2Steep Riffle or Head CutHead Cut 0-----0-----0
T1.01-A2Steep Riffle or Head CutHead Cut 0-----0-----0
T1.01-A2Stormwater InputField Ditch 0-----0-----0
T1.01-A2Stormwater InputField Ditch 0-----0-----0
T1.01-A2Stormwater InputRoad Ditch 0-----0-----0
T1.01-A2Stormwater InputUrban Stormwater Pipe 0-----0-----0
T1.01-A2Stormwater InputUrban Stormwater Pipe 0-----0-----0
T1.01-B2Debris Jam  0-----0-----0
T1.01-B2Debris Jam  0-----0-----0
T1.01-B2Debris Jam  0-----0-----0
T1.01-B2Erosion Left Bank20.66Height3-----0
T1.01-B2Erosion Left Bank22.53Height2-----0
T1.01-B2Erosion Right Bank17.04Height2-----0
T1.01-B2Erosion Right Bank52.24Height5-----0
T1.01-B2Gully  0Height4-----0
T1.01-B2Mass Failure Left Bank14.4Height15-----0
T1.01-B2Mass Failure Left Bank44.97Height25-----0
T1.01-B2Mass Failure Right Bank28.68Height15-----0
T1.01-B2Steep Riffle or Head CutHead Cut 0-----0-----0
T1.02-02Bridge or CulvertCulvert 0Length75-----0
T1.02-02Bridge or CulvertCulvert 0Length30-----0
T1.02-02Buffers Less than 25 feet Right Bank126.58-----0-----0
T1.02-02Debris Jam  0-----0-----0
T1.02-02Development Both Sides173.3-----0-----0
T1.02-02Development One Side103.59-----0-----0
T1.02-02Development One Side150.46-----0-----0
T1.02-02Development One Side186.45-----0-----0
T1.02-02Erosion Left Bank20.88Height2-----0
T1.02-02Erosion Left Bank133.08Height3-----0
T1.02-02Erosion Right Bank61.03Height3-----0
T1.02-02Erosion Right Bank133.29Height3-----0
T1.02-02MigrationBraiding 0-----0-----0
T1.02-02MigrationFlood Chute 0-----0-----0
T1.02-02Steep Riffle or Head CutHead Cut 0-----0-----0
T1.02-02Stormwater InputRoad Ditch 0-----0-----0
T1.02-02Stream CrossingStream Ford 0-----0-----0