T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 24.85 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 129.53 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 150.26 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 14.25 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 49.65 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 73.26 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T4.01-D | 2 | Bridge or Culvert | Culvert | | 0 | Length | 50 | ----- | 0 |
T4.01-D | 2 | Buffers Less than 25 feet | | Left Bank | 188.47 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Development | | One Side | 352.81 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Development | | One Side | 459.72 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Encroachment | Road | One Side | 205.7 | Height | 8 | ----- | 0 |
T4.01-D | 2 | Encroachment | Road | One Side | 228.37 | Height | 8 | ----- | 0 |
T4.01-D | 2 | Encroachment | Road | One Side | 430.12 | Height | 7 | ----- | 0 |
T4.01-D | 2 | Erosion | | Left Bank | 24.37 | Height | 4 | ----- | 0 |
T4.01-D | 2 | Erosion | | Left Bank | 31.09 | Height | 6 | ----- | 0 |
T4.01-D | 2 | Erosion | | Left Bank | 37.06 | Height | 5 | ----- | 0 |
T4.01-D | 2 | Erosion | | Left Bank | 37.15 | Height | 3 | ----- | 0 |
T4.01-D | 2 | Erosion | | Left Bank | 77.7 | Height | 3 | ----- | 0 |
T4.01-D | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 3 |
T4.01-D | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 2 |
T4.01-D | 2 | Gully | | | 0 | Height | 1 | Length | 2 |
T4.01-D | 2 | Mass Failure | | Left Bank | 32.3 | Height | 15 | ----- | 0 |
T4.01-D | 2 | Mass Failure | | Left Bank | 43.96 | Height | 12 | ----- | 0 |
T4.01-D | 2 | Mass Failure | | Right Bank | 69.73 | Height | 8 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Straightening | Straightening | | 168.19 | ----- | 0 | ----- | 0 |
T4.01-D | 2 | Straightening | Straightening | | 869.54 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 9.34 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 164.25 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 161.83 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 184.63 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 425.3 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 162.42 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 183.94 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 261.34 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 0 | ----- | 0 |
T5.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 50.94 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 51.42 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 445.71 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 63.57 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 142.04 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 443.58 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.01-A | 2 | Development | | Both Sides | 790.29 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Encroachment | Road | Both Sides | 269.11 | Height | 6 | ----- | 0 |
T5.01-A | 2 | Encroachment | Road | One Side | 302.34 | Height | 6 | ----- | 0 |
T5.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T5.01-A | 2 | Straightening | Straightening | | 762.02 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 319.59 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 580.36 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 1015.12 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 44.49 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 81.92 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 97.04 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 141.56 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 249.61 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 558.97 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 1022.2 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 250 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 50 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 50 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 100 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 150 | ----- | 0 |
T6.01-A | 2 | Bridge or Culvert | Culvert | | 0 | Length | 200 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 177.66 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 248.81 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 574.58 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 171.02 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 526.45 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Buffers Less than 25 feet | | Right Bank | 1605.61 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | Both Sides | 72.48 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | Both Sides | 258.99 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | Both Sides | 426.47 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | Both Sides | 513.3 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | One Side | 176.39 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | One Side | 212.65 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | One Side | 291.83 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Development | | One Side | 400.09 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Dredging | Dredging | Exact Location | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Encroachment | Road | Both Sides | 262.28 | Height | 6 | ----- | 0 |
T6.01-A | 2 | Encroachment | Road | Both Sides | 377.87 | Height | 7 | ----- | 0 |
T6.01-A | 2 | Encroachment | Road | One Side | 154.71 | Height | 6 | ----- | 0 |
T6.01-A | 2 | Encroachment | Road | One Side | 186.13 | Height | 5 | ----- | 0 |
T6.01-A | 2 | Encroachment | Road | One Side | 777.11 | Height | 6 | ----- | 0 |
T6.01-A | 2 | Erosion | | Right Bank | 36.08 | Height | 3 | ----- | 0 |
T6.01-A | 2 | Grade Control | Dam | No Picture | 0 | Height | 0 | HtAbvWater | 6 |
T6.01-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 2 |
T6.01-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 2 | HtAbvWater | 1 |
T6.01-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 1 |
T6.01-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 3 |
T6.01-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 1 |
T6.01-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Straightening | Straightening | | 121.1 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Straightening | Straightening | | 2848.91 | ----- | 0 | ----- | 0 |
T6.01-A | 2 | Straightening | With Windrowing | | 198.89 | ----- | 0 | ----- | 0 |