Skip Navigation LinksHome > Projects List > Phase 1 >

Hungerford Brook

Data stored from FIT file

Return to File List

Version: 4.56

ReachPhaseImpactSub ImpactLocationLength (ft.)Name 1Value 1Name 2Value 2
M4T2.03-02Bank Armoring or RevetmentRip-RapRight Bank113.55-----0-----0
M4T2.03-02Bridge or Culvert  49.13Length50-----0
M4T2.03-02Debris Jam  0-----0-----0
M4T2.03-02Debris Jam  0-----0-----0
M4T2.03-02Development Both Sides37.09-----0-----0
M4T2.03-02Erosion Left Bank48.06Height2-----0
M4T2.03-02Erosion Left Bank54.17Height2-----0
M4T2.03-02Erosion Left Bank62.76Height2-----0
M4T2.03-02Erosion Right Bank26.13Height2-----0
M4T2.03-02Erosion Right Bank26.65Height2-----0
M4T2.03-02Erosion Right Bank42.88Height2-----0
M4T2.03-02Erosion Right Bank54.4Height2-----0
M4T2.03-02Erosion Right Bank57.09Height2-----0
M4T2.03-02Erosion Right Bank70.44Height2-----0
M4T2.03-02Erosion Right Bank86.78Height3-----0
M4T2.03-02Grade ControlLedgeDownstream0Height15HtAbvWater0
M4T2.03-02Grade ControlLedgeDownstream0Height1HtAbvWater0
M4T2.03-02Grade ControlLedgeDownstream0Height1HtAbvWater0
M4T2.03-02Grade ControlLedgeDownstream0Height1HtAbvWater0
M4T2.03-02MigrationFlood Chute 0-----0-----0
M4T2.03-02MigrationFlood Chute 0-----0-----0
M4T2.03-02MigrationFlood Chute 0-----0-----0
M4T2.03-02MigrationFlood Chute 0-----0-----0
M4T2.03-02Stormwater Input  0-----0-----0
M4T2.03-02Stream CrossingStream Ford 0-----0-----0
M4T2.03-02Stream CrossingStream Ford 0-----0-----0