M04-0 | 2 | Beaver Dam | | | 0 | Length | 4600 | ----- | 0 |
M04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 142.02 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 440.53 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 61.92 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 107.2 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 151.13 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 167.53 | Height | 6 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 182.6 | Height | 5 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 303.71 | Height | 5 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 309.92 | Height | 5 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 330.52 | Height | 6 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 400.74 | Height | 5 | ----- | 0 |
M04-0 | 2 | Erosion | | Left Bank | 414.64 | Height | 6 | ----- | 0 |
M04-0 | 2 | Erosion | | Right Bank | 71.91 | Height | 5 | ----- | 0 |
M04-0 | 2 | Erosion | | Right Bank | 144.33 | Height | 6 | ----- | 0 |
M04-0 | 2 | Erosion | | Right Bank | 413.29 | Height | 6 | ----- | 0 |
M04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M04-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 69 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 69.89 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 700 | ----- | 0 |
M05-0 | 2 | Buffers Less than 25 feet | | Left Bank | 77.16 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 79.48 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 228.36 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 267.67 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Development | | Both Sides | 88.83 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Encroachment | Road | One Side | 830.54 | Height | 16 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 64.44 | Height | 4 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 73.79 | Height | 5 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 114.52 | Height | 4 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 130.33 | Height | 3 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 140.92 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 192.98 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 253.55 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 295.81 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 310.5 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 334.72 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 433.52 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Left Bank | 648.81 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 79.68 | Height | 4 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 92.14 | Height | 5 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 102.23 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 104.17 | Height | 7 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 130.44 | Height | 5 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 134.47 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 162.34 | Height | 5 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 199.76 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 327.64 | Height | 6 | ----- | 0 |
M05-0 | 2 | Erosion | | Right Bank | 364.28 | Height | 6 | ----- | 0 |
M05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M05-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1167.74 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1000.32 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Cross Section Location | NOT Representative | | 0 | Number | 1 | ----- | 0 |
M06-0 | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
M06-0 | 2 | Erosion | | Left Bank | 56.16 | Height | 3 | ----- | 0 |
M06-0 | 2 | Erosion | | Left Bank | 64.82 | Height | 5 | ----- | 0 |
M06-0 | 2 | Erosion | | Right Bank | 73.81 | Height | 5 | ----- | 0 |
M06-0 | 2 | Erosion | | Right Bank | 204.2 | Height | 5 | ----- | 0 |
M06-0 | 2 | Mass Failure | | Right Bank | 117.39 | Height | 20 | ----- | 0 |
M06-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
M06-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M07-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 24.26 | ----- | 0 | ----- | 0 |
M07-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 40.1 | ----- | 0 | ----- | 0 |
M07-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 100 | ----- | 0 |
M07-A | 2 | Buffers Less than 25 feet | | Left Bank | 716.61 | ----- | 0 | ----- | 0 |
M07-A | 2 | Buffers Less than 25 feet | | Left Bank | 823.78 | ----- | 0 | ----- | 0 |
M07-A | 2 | Buffers Less than 25 feet | | Right Bank | 751.42 | ----- | 0 | ----- | 0 |
M07-A | 2 | Buffers Less than 25 feet | | Right Bank | 886.62 | ----- | 0 | ----- | 0 |
M07-A | 2 | Cross Section Location | NOT Representative | | 0 | Number | 1 | ----- | 0 |
M07-A | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
M07-A | 2 | Development | | Both Sides | 40.99 | ----- | 0 | ----- | 0 |
M07-A | 2 | Erosion | | Left Bank | 40.35 | Height | 2 | ----- | 0 |
M07-A | 2 | Erosion | | Left Bank | 58.13 | Height | 3 | ----- | 0 |
M07-A | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
M07-A | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
M07-A | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
M07-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M07-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 50 | ----- | 0 |
M07-B | 2 | Buffers Less than 25 feet | | Left Bank | 353.93 | ----- | 0 | ----- | 0 |
M07-B | 2 | Buffers Less than 25 feet | | Right Bank | 95.58 | ----- | 0 | ----- | 0 |
M07-B | 2 | Buffers Less than 25 feet | | Right Bank | 281.33 | ----- | 0 | ----- | 0 |
M07-B | 2 | Cross Section Location | Representative | | 0 | Number | 3 | ----- | 0 |
M07-B | 2 | Erosion | | Left Bank | 34.56 | Height | 4 | ----- | 0 |
M07-B | 2 | Erosion | | Left Bank | 48.1 | Height | 5 | ----- | 0 |
M07-B | 2 | Erosion | | Left Bank | 52.41 | Height | 3 | ----- | 0 |
M07-B | 2 | Erosion | | Left Bank | 96.55 | Height | 4 | ----- | 0 |
M07-B | 2 | Erosion | | Right Bank | 64.03 | Height | 4 | ----- | 0 |
M07-B | 2 | Grade Control | Waterfall | Picture | 0 | Height | 17 | HtAbvWater | 13 |
M07-B | 2 | Gully | | | 0 | Height | 4 | Length | 95 |
M07-B | 2 | Mass Failure | | Left Bank | 19.89 | Height | 25 | ----- | 0 |
M07-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M07-B | 2 | Stormwater Input | Other | | 0 | ----- | 0 | ----- | 0 |
M07-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M07-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M07-B | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Beaver Dam | | | 0 | Length | 900 | ----- | 0 |
M08-A | 2 | Beaver Dam | | | 0 | Length | 500 | ----- | 0 |
M08-A | 2 | Buffers Less than 25 feet | | Right Bank | 60.74 | ----- | 0 | ----- | 0 |
M08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Encroachment | Road | One Side | 286.69 | Height | 7 | ----- | 0 |
M08-A | 2 | Encroachment | Road | One Side | 1878.95 | Height | 7 | ----- | 0 |
M08-A | 2 | Encroachment | Road | One Side | 3679.1 | Height | 7 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 88.79 | Height | 2 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 105.5 | Height | 2 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 109.36 | Height | 4 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 120.18 | Height | 4 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 121.93 | Height | 4 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 145.15 | Height | 3 | ----- | 0 |
M08-A | 2 | Erosion | | Left Bank | 232.72 | Height | 4 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 65.52 | Height | 3 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 77.39 | Height | 2 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 94.35 | Height | 3 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 122.16 | Height | 4 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 140.2 | Height | 5 | ----- | 0 |
M08-A | 2 | Erosion | | Right Bank | 232.79 | Height | 4 | ----- | 0 |
M08-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
M08-A | 2 | Straightening | Straightening | | 1392.36 | ----- | 0 | ----- | 0 |
M08-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M08-B | 2 | Erosion | | Left Bank | 63.7 | Height | 3 | ----- | 0 |
M08-B | 2 | Erosion | | Left Bank | 171.98 | Height | 4 | ----- | 0 |
M08-B | 2 | Erosion | | Left Bank | 221.46 | Height | 4 | ----- | 0 |
M08-B | 2 | Erosion | | Right Bank | 205.19 | Height | 2 | ----- | 0 |
M08-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M08-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M08-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M08-B | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
M08-B | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
M08-B | 2 | Straightening | Straightening | | 410.69 | ----- | 0 | ----- | 0 |
M08-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M09-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 55.29 | ----- | 0 | ----- | 0 |
M09-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 140.7 | ----- | 0 | ----- | 0 |
M09-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 300 | ----- | 0 |
M09-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M09-A | 2 | Development | | Both Sides | 33.33 | ----- | 0 | ----- | 0 |
M09-A | 2 | Development | | Both Sides | 96.38 | ----- | 0 | ----- | 0 |
M09-A | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
M09-A | 2 | Encroachment | Berm | One Side | 148.63 | Height | 6 | ----- | 0 |
M09-A | 2 | Encroachment | Berm | One Side | 172.3 | Height | 6 | ----- | 0 |
M09-A | 2 | Encroachment | Improved Path | One Side | 49.13 | Height | 6 | ----- | 0 |
M09-A | 2 | Erosion | | Left Bank | 8.64 | Height | 4 | ----- | 0 |
M09-A | 2 | Erosion | | Left Bank | 25.88 | Height | 3 | ----- | 0 |
M09-A | 2 | Erosion | | Left Bank | 41.81 | Height | 4 | ----- | 0 |
M09-A | 2 | Erosion | | Left Bank | 207.34 | Height | 5 | ----- | 0 |
M09-A | 2 | Erosion | | Right Bank | 32.53 | Height | 5 | ----- | 0 |
M09-A | 2 | Straightening | Straightening | | 432.3 | ----- | 0 | ----- | 0 |
M09-B | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
M09-B | 2 | Erosion | | Left Bank | 31.11 | Height | 4 | ----- | 0 |
M09-B | 2 | Erosion | | Right Bank | 7.48 | Height | 5 | ----- | 0 |
M09-C | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 42.29 | ----- | 0 | ----- | 0 |
M09-C | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 35 | ----- | 0 | ----- | 0 |
M09-C | 2 | Beaver Dam | | | 0 | Length | 600 | ----- | 0 |
M09-C | 2 | Bridge or Culvert | Bridge | | 0 | Length | 350 | ----- | 0 |
M09-C | 2 | Buffers Less than 25 feet | | Left Bank | 73.89 | ----- | 0 | ----- | 0 |
M09-C | 2 | Buffers Less than 25 feet | | Right Bank | 51.64 | ----- | 0 | ----- | 0 |
M09-C | 2 | Development | | Both Sides | 60.45 | ----- | 0 | ----- | 0 |
M09-C | 2 | Encroachment | Berm | One Side | 32.86 | Height | 9 | ----- | 0 |
M09-C | 2 | Erosion | | Right Bank | 68.71 | Height | 5 | ----- | 0 |
M09-C | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Beaver Dam | | | 0 | Length | 5 | ----- | 0 |
M10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 70.88 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 82.56 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 89.89 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 223.02 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 2070.69 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M10-0 | 2 | Stormwater Input | Overland Flow | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Beaver Dam | | | 0 | Length | 500 | ----- | 0 |
M11-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 25 | ----- | 0 |
M11-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 10 | ----- | 0 |
M11-A | 2 | Buffers Less than 25 feet | | Right Bank | 22.14 | ----- | 0 | ----- | 0 |
M11-A | 2 | Buffers Less than 25 feet | | Right Bank | 47.13 | ----- | 0 | ----- | 0 |
M11-A | 2 | Buffers Less than 25 feet | | Right Bank | 81.42 | ----- | 0 | ----- | 0 |
M11-A | 2 | Buffers Less than 25 feet | | Right Bank | 211.64 | ----- | 0 | ----- | 0 |
M11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-A | 2 | Straightening | Straightening | | 662.07 | ----- | 0 | ----- | 0 |
M11-B | 2 | Beaver Dam | | | 0 | Length | 800 | ----- | 0 |
M11-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 10 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Left Bank | 43.24 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Left Bank | 57.57 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Right Bank | 43.58 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Right Bank | 47.58 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Right Bank | 48.72 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Right Bank | 124.07 | ----- | 0 | ----- | 0 |
M11-B | 2 | Buffers Less than 25 feet | | Right Bank | 127.27 | ----- | 0 | ----- | 0 |
M11-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Erosion | | Left Bank | 111.42 | Height | 4 | ----- | 0 |
M11-B | 2 | Erosion | | Left Bank | 164.38 | Height | 3 | ----- | 0 |
M11-B | 2 | Erosion | | Left Bank | 184.82 | Height | 4 | ----- | 0 |
M11-B | 2 | Erosion | | Right Bank | 170.11 | Height | 4 | ----- | 0 |
M11-B | 2 | Erosion | | Right Bank | 176.14 | Height | 4 | ----- | 0 |
M11-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Overland Flow | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Overland Flow | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stormwater Input | Overland Flow | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Straightening | Straightening | | 733.38 | ----- | 0 | ----- | 0 |
M11-B | 2 | Straightening | Straightening | | 842.27 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M11-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 100.53 | ----- | 0 | ----- | 0 |
M12-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 131.78 | ----- | 0 | ----- | 0 |
M12-A | 2 | Buffers Less than 25 feet | | Left Bank | 77.75 | ----- | 0 | ----- | 0 |
M12-A | 2 | Buffers Less than 25 feet | | Left Bank | 136.61 | ----- | 0 | ----- | 0 |
M12-A | 2 | Buffers Less than 25 feet | | Right Bank | 57.18 | ----- | 0 | ----- | 0 |
M12-A | 2 | Buffers Less than 25 feet | | Right Bank | 88.59 | ----- | 0 | ----- | 0 |
M12-A | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
M12-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Encroachment | Road | One Side | 2533.8 | Height | 10 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 35.77 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 44.01 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 47.27 | Height | 4 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 50.92 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 66.5 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 128.76 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Left Bank | 165.69 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 24.73 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 29.79 | Height | 2 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 36.92 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 51.19 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 73.22 | Height | 4 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 82.71 | Height | 3 | ----- | 0 |
M12-A | 2 | Erosion | | Right Bank | 110.52 | Height | 3 | ----- | 0 |
M12-A | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Stormwater Input | Overland Flow | | 0 | ----- | 0 | ----- | 0 |
M12-A | 2 | Stormwater Input | Tile Drain | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 13.82 | ----- | 0 | ----- | 0 |
M12-B | 2 | Bridge or Culvert | Culvert | | 0 | Length | 200 | ----- | 0 |
M12-B | 2 | Bridge or Culvert | Culvert | | 0 | Length | 200 | ----- | 0 |
M12-B | 2 | Cross Section Location | NOT Representative | | 0 | Number | 3 | ----- | 0 |
M12-B | 2 | Development | | Both Sides | 52.63 | ----- | 0 | ----- | 0 |
M12-B | 2 | Development | | Both Sides | 53.85 | ----- | 0 | ----- | 0 |
M12-B | 2 | Development | | One Side | 125.79 | ----- | 0 | ----- | 0 |
M12-B | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Encroachment | Berm | One Side | 258.01 | Height | 8 | ----- | 0 |
M12-B | 2 | Erosion | | Right Bank | 2.12 | Height | 2 | ----- | 0 |
M12-B | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
M12-B | 2 | Straightening | Straightening | | 629.34 | ----- | 0 | ----- | 0 |
M13-A | 2 | Cross Section Location | NOT Representative | | 0 | Number | 2 | ----- | 0 |
M13-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
M13-A | 2 | Erosion | | Left Bank | 117.55 | Height | 3 | ----- | 0 |
M13-A | 2 | Erosion | | Right Bank | 55.48 | Height | 2 | ----- | 0 |
M13-A | 2 | Erosion | | Right Bank | 57.17 | Height | 3 | ----- | 0 |
M13-A | 2 | Erosion | | Right Bank | 63.45 | Height | 2 | ----- | 0 |
M13-A | 2 | Mass Failure | | Left Bank | 60.84 | Height | 35 | ----- | 0 |
M13-A | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
M13-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M13-A | 2 | Straightening | Straightening | | 297.93 | ----- | 0 | ----- | 0 |
M13-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Cross Section Location | Representative | | 0 | Number | 3 | ----- | 0 |
M13-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Development | | Both Sides | 27.96 | ----- | 0 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 45.55 | Height | 12 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 46.35 | Height | 6 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 49.39 | Height | 6 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 65.04 | Height | 8 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 78.79 | Height | 5 | ----- | 0 |
M13-B | 2 | Erosion | | Left Bank | 101.17 | Height | 3 | ----- | 0 |
M13-B | 2 | Erosion | | Right Bank | 41.96 | Height | 6 | ----- | 0 |
M13-B | 2 | Erosion | | Right Bank | 102.71 | Height | 4 | ----- | 0 |
M13-B | 2 | Gully | | | 0 | Height | 2 | Length | 12 |
M13-B | 2 | Mass Failure | | Right Bank | 46.85 | Height | 15 | ----- | 0 |
M13-B | 2 | Mass Failure | | Right Bank | 48.02 | Height | 25 | ----- | 0 |
M13-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Stormwater Input | Tile Drain | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Stormwater Input | Tile Drain | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
M13-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Buffers Less than 25 feet | | Left Bank | 83.04 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T2.01-A | 2 | Straightening | Straightening | | 505.02 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 45.94 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 46.33 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Beaver Dam | | | 0 | Length | 10 | ----- | 0 |
T2.01-B | 2 | Beaver Dam | | | 0 | Length | 5 | ----- | 0 |
T2.01-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 200 | ----- | 0 |
T2.01-B | 2 | Buffers Less than 25 feet | | Left Bank | 68.17 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Buffers Less than 25 feet | | Right Bank | 60.09 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Development | | Both Sides | 36.5 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Encroachment | Road | One Side | 61.1 | Height | 9 | ----- | 0 |
T2.01-B | 2 | Erosion | | Left Bank | 80.86 | Height | 4 | ----- | 0 |
T2.01-B | 2 | Erosion | | Left Bank | 82.08 | Height | 3 | ----- | 0 |
T2.01-B | 2 | Erosion | | Left Bank | 105.37 | Height | 3 | ----- | 0 |
T2.01-B | 2 | Erosion | | Right Bank | 36.25 | Height | 3 | ----- | 0 |
T2.01-B | 2 | Erosion | | Right Bank | 42.5 | Height | 3 | ----- | 0 |
T2.01-B | 2 | Erosion | | Right Bank | 56.01 | Height | 3 | ----- | 0 |
T2.01-B | 2 | Erosion | | Right Bank | 72.17 | Height | 2 | ----- | 0 |
T2.01-B | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.01-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Buffers Less than 25 feet | | Left Bank | 75.14 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Buffers Less than 25 feet | | Left Bank | 843.43 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Buffers Less than 25 feet | | Right Bank | 76.46 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Buffers Less than 25 feet | | Right Bank | 990.61 | ----- | 0 | ----- | 0 |
T2.01-C | 2 | Encroachment | Road | One Side | 84.12 | Height | 9 | ----- | 0 |
T2.01-C | 2 | Stream Crossing | Animal Crossing | | 0 | ----- | 0 | ----- | 0 |