T1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 90.63 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 446.3 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 60 | ----- | 0 |
T1.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T1.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 156.93 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1829.14 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 58.05 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 164.04 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1831 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Development | | One Side | 287.2 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Encroachment | Road | One Side | 61.15 | Height | 20 | ----- | 0 |
T1.01-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Straightening | Straightening | | 491.18 | ----- | 0 | ----- | 0 |
T1.01-0 | 2 | Straightening | Straightening | | 809.59 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 2730.23 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T1.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 477.9 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 2827.15 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Development | | One Side | 172.53 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Development | | One Side | 178.72 | ----- | 0 | ----- | 0 |
T1.02-0 | 2 | Encroachment | Road | One Side | 4050.54 | Height | 20 | ----- | 0 |
T1.02-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 6 | HtAbvWater | 2 |
T1.03-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 544.77 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 821.43 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1054.97 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 220.11 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1441.98 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 2310.93 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Development | | One Side | 232.17 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Development | | One Side | 455.72 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Encroachment | Road | One Side | 226.53 | Height | 15 | ----- | 0 |
T1.03-0 | 2 | Encroachment | Road | One Side | 715.32 | Height | 20 | ----- | 0 |
T1.03-0 | 2 | Encroachment | Road | One Side | 813.99 | Height | 15 | ----- | 0 |
T1.03-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 0 | HtAbvWater | 0 |
T1.03-0 | 2 | Straightening | Straightening | | 680.72 | ----- | 0 | ----- | 0 |
T1.03-0 | 2 | Straightening | Straightening | | 1139.06 | ----- | 0 | ----- | 0 |
T1.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 853.35 | ----- | 0 | ----- | 0 |
T1.05-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T1.05-0 | 2 | Development | | One Side | 677.56 | ----- | 0 | ----- | 0 |
T1.05-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 0 | HtAbvWater | 0 |
T1.05-0 | 2 | Straightening | Straightening | | 232.25 | ----- | 0 | ----- | 0 |
T1.06-0 | 2 | Encroachment | Road | One Side | 1500.01 | Height | 15 | ----- | 0 |
T1.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 66.69 | ----- | 0 | ----- | 0 |
T1.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 67.39 | ----- | 0 | ----- | 0 |
T1.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T1.07-0 | 2 | Development | | Both Sides | 202.78 | ----- | 0 | ----- | 0 |
T1.07-0 | 2 | Encroachment | Road | One Side | 151.34 | Height | 15 | ----- | 0 |
T1.07-0 | 2 | Encroachment | Road | One Side | 694.42 | Height | 20 | ----- | 0 |
T1.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 310.37 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 770.31 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T1.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 338.65 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 112.31 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 370.1 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 817.37 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Development | | One Side | 273.63 | ----- | 0 | ----- | 0 |
T1.08-0 | 2 | Encroachment | Road | One Side | 941.96 | Height | 15 | ----- | 0 |
T1.08-0 | 2 | Encroachment | Road | One Side | 3065.15 | Height | 15 | ----- | 0 |
T1.08-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 8 | HtAbvWater | 2 |
T1.08-0 | 2 | Straightening | Straightening | | 112.31 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T1.09-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Left Bank | 774.55 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 108.8 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 144.88 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 289.55 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 601.88 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Buffers Less than 25 feet | | Right Bank | 830.75 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Development | | Both Sides | 337.05 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Development | | One Side | 236.19 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Development | | One Side | 780.86 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Encroachment | Road | Both Sides | 253.85 | Height | 15 | ----- | 0 |
T1.09-0 | 2 | Encroachment | Road | One Side | 599.71 | Height | 15 | ----- | 0 |
T1.09-0 | 2 | Encroachment | Road | One Side | 4280.81 | Height | 15 | ----- | 0 |
T1.09-0 | 2 | Straightening | Straightening | | 463 | ----- | 0 | ----- | 0 |
T1.09-0 | 2 | Straightening | Straightening | | 932.65 | ----- | 0 | ----- | 0 |
T1.10-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T1.10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 295.48 | ----- | 0 | ----- | 0 |
T1.12-0 | 2 | Buffers Less than 25 feet | | Left Bank | 146.2 | ----- | 0 | ----- | 0 |
T1.12-0 | 2 | Buffers Less than 25 feet | | Right Bank | 102.07 | ----- | 0 | ----- | 0 |
T1.12-0 | 2 | Development | | One Side | 243.87 | ----- | 0 | ----- | 0 |
T1.13-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 40 | ----- | 0 |
T1.13-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 8 | ----- | 0 |
T1.13-0 | 2 | Buffers Less than 25 feet | | Left Bank | 529.43 | ----- | 0 | ----- | 0 |
T1.13-0 | 2 | Buffers Less than 25 feet | | Right Bank | 576.66 | ----- | 0 | ----- | 0 |
T1.13-0 | 2 | Development | | Both Sides | 571.37 | ----- | 0 | ----- | 0 |
T1.13-0 | 2 | Encroachment | Road | Both Sides | 529.15 | Height | 0 | ----- | 0 |
T1.13-0 | 2 | Flow Regs and Withdrawals | Large Run of River | Recreation | 0 | ----- | 0 | ----- | 0 |
T1.13-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 14 | HtAbvWater | 14 |
T1.7S1.01-0 | 2 | Development | | One Side | 254.83 | ----- | 0 | ----- | 0 |
T2.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T2.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 40 | ----- | 0 |
T2.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 7.04 | ----- | 0 | ----- | 0 |
T2.01-0 | 2 | Grade Control | Waterfall | No Picture | 0 | Height | 0 | HtAbvWater | 0 |
T2.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 479.06 | ----- | 0 | ----- | 0 |
T2.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 104.06 | ----- | 0 | ----- | 0 |
T2.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 124.97 | ----- | 0 | ----- | 0 |
T2.02-0 | 2 | Development | | One Side | 646.06 | ----- | 0 | ----- | 0 |
T2.02-0 | 2 | Straightening | Straightening | | 368.7 | ----- | 0 | ----- | 0 |
T2.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 160.66 | ----- | 0 | ----- | 0 |
T2.03-0 | 2 | Development | | One Side | 1332.19 | ----- | 0 | ----- | 0 |
T2.03-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T2.03-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 419.82 | ----- | 0 | ----- | 0 |
T2.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Buffers Less than 25 feet | | Left Bank | 823.39 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1135.78 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 74.94 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 851.58 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.05-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 22 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 41.36 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 56.02 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 86.74 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 232.28 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 375.91 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 21.09 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 22.23 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 165.65 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Beaver Dam | | | 0 | Length | 0 | ----- | 0 |
T2.07-0 | 2 | Beaver Dam | | | 0 | Length | 120 | ----- | 0 |
T2.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 18 | ----- | 0 |
T2.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 22 | ----- | 0 |
T2.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 791.46 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1479.52 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Development | | One Side | 180.41 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Encroachment | Road | One Side | 189.04 | Height | 6 | ----- | 0 |
T2.07-0 | 2 | Encroachment | Road | One Side | 732.88 | Height | 3 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Left Bank | 20.52 | Height | 4 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Left Bank | 25.67 | Height | 3 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Left Bank | 33.32 | Height | 5 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Left Bank | 63.33 | Height | 3 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Right Bank | 20.83 | Height | 4 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Right Bank | 31.53 | Height | 4 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Right Bank | 53.03 | Height | 4 | ----- | 0 |
T2.07-0 | 2 | Erosion | | Right Bank | 76.79 | Height | 8 | ----- | 0 |
T2.07-0 | 2 | Gully | | | 0 | Height | 4 | Length | 200 |
T2.07-0 | 2 | Gully | | | 0 | Height | 10 | Length | 100 |
T2.07-0 | 2 | Mass Failure | | Right Bank | 15.7 | Height | 15 | ----- | 0 |
T2.07-0 | 2 | Mass Failure | | Right Bank | 83.2 | Height | 25 | ----- | 0 |
T2.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Straightening | Straightening | | 234.45 | ----- | 0 | ----- | 0 |
T2.07-0 | 2 | Straightening | Straightening | | 393.64 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 99.45 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 123.4 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Beaver Dam | | | 0 | Length | 25 | ----- | 0 |
T2.08-A | 2 | Buffers Less than 25 feet | | Right Bank | 605.2 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-A | 2 | Encroachment | Road | One Side | 0 | Height | 3 | ----- | 0 |
T2.08-A | 2 | Encroachment | Road | One Side | 1916.51 | Height | 3 | ----- | 0 |
T2.08-A | 2 | Erosion | | Left Bank | 39.81 | Height | 7 | ----- | 0 |
T2.08-A | 2 | Erosion | | Right Bank | 34 | Height | 3 | ----- | 0 |
T2.08-A | 2 | Mass Failure | | Left Bank | 27.84 | Height | 10 | ----- | 0 |
T2.08-A | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 41.48 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 99.16 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 301.94 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 53.86 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T2.08-B | 2 | Buffers Less than 25 feet | | Left Bank | 376.9 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Cross Section Location | Representative | | 0 | Number | 2 | ----- | 0 |
T2.08-B | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T2.08-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Development | | One Side | 364.05 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Encroachment | Road | One Side | 818 | Height | 3 | ----- | 0 |
T2.08-B | 2 | Grade Control | Ledge | No Picture | 0 | Height | 8 | HtAbvWater | 7 |
T2.08-B | 2 | Grade Control | Ledge | No Picture | 0 | Height | 7 | HtAbvWater | 5 |
T2.08-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 4 |
T2.08-B | 2 | Mass Failure | | Right Bank | 58.92 | Height | 20 | ----- | 0 |
T2.08-B | 2 | Mass Failure | | Right Bank | 116.85 | Height | 25 | ----- | 0 |
T2.08-B | 2 | Mass Failure | | Right Bank | 144.49 | Height | 30 | ----- | 0 |
T2.08-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T2.08-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Bank Armoring or Revetment | Other | Left Bank | 122.34 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 487.72 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 52 | ----- | 0 |
T2.09-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Encroachment | Improved Path | One Side | 504.31 | Height | 8 | ----- | 0 |
T2.09-0 | 2 | Encroachment | Improved Path | One Side | 3029.43 | Height | 4 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 43.48 | Height | 4 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 45.23 | Height | 4 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 72.31 | Height | 8 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 94.06 | Height | 0 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 95.91 | Height | 4 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 172.01 | Height | 2 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Left Bank | 220.68 | Height | 8 | ----- | 0 |
T2.09-0 | 2 | Erosion | | Right Bank | 37.52 | Height | 6 | ----- | 0 |
T2.09-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 3 | HtAbvWater | 2 |
T2.09-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 1 | HtAbvWater | 0 |
T2.09-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 3 | HtAbvWater | 2 |
T2.09-0 | 2 | Gully | | | 0 | Height | 2 | Length | 80 |
T2.09-0 | 2 | Mass Failure | | Left Bank | 87.77 | Height | 20 | ----- | 0 |
T2.09-0 | 2 | Mass Failure | | Right Bank | 62.31 | Height | 15 | ----- | 0 |
T2.09-0 | 2 | Mass Failure | | Right Bank | 108.41 | Height | 20 | ----- | 0 |
T2.09-0 | 2 | Mass Failure | | Right Bank | 162.51 | Height | 35 | ----- | 0 |
T2.09-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Encroachment | Improved Path | One Side | 200.72 | Height | 8 | ----- | 0 |
T2.10-0 | 2 | Encroachment | Improved Path | One Side | 240.96 | Height | 4 | ----- | 0 |
T2.10-0 | 2 | Encroachment | Improved Path | One Side | 838.26 | Height | 4 | ----- | 0 |
T2.10-0 | 2 | Erosion | | Left Bank | 29.59 | Height | 6 | ----- | 0 |
T2.10-0 | 2 | Erosion | | Left Bank | 45.4 | Height | 8 | ----- | 0 |
T2.10-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 1 | HtAbvWater | 0 |
T2.10-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 5 | HtAbvWater | 3 |
T2.10-0 | 2 | Mass Failure | | Left Bank | 48.76 | Height | 30 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Left Bank | 72.54 | Height | 40 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 60.5 | Height | 20 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 82.41 | Height | 25 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 90.75 | Height | 30 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 98.63 | Height | 40 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 105.17 | Height | 40 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 112.85 | Height | 15 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 121.84 | Height | 30 | ----- | 0 |
T2.10-0 | 2 | Mass Failure | | Right Bank | 148.88 | Height | 15 | ----- | 0 |
T2.10-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.10-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-A | 2 | Encroachment | Improved Path | One Side | 1820.02 | Height | 8 | ----- | 0 |
T2.11-A | 2 | Grade Control | Ledge | No Picture | 0 | Height | 6 | HtAbvWater | 3 |
T2.11-A | 2 | Mass Failure | | Right Bank | 41.07 | Height | 10 | ----- | 0 |
T2.11-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 91.36 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Buffers Less than 25 feet | | Right Bank | 136.82 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Encroachment | Improved Path | One Side | 336.49 | Height | 8 | ----- | 0 |
T2.11-B | 2 | Erosion | | Left Bank | 23.16 | Height | 6 | ----- | 0 |
T2.11-B | 2 | Erosion | | Left Bank | 33.28 | Height | 15 | ----- | 0 |
T2.11-B | 2 | Erosion | | Left Bank | 45.95 | Height | 8 | ----- | 0 |
T2.11-B | 2 | Erosion | | Left Bank | 87.98 | Height | 10 | ----- | 0 |
T2.11-B | 2 | Erosion | | Right Bank | 24.02 | Height | 6 | ----- | 0 |
T2.11-B | 2 | Erosion | | Right Bank | 86.78 | Height | 5 | ----- | 0 |
T2.11-B | 2 | Erosion | | Right Bank | 129.37 | Height | 3 | ----- | 0 |
T2.11-B | 2 | Gully | | | 0 | Height | 6 | Length | 400 |
T2.11-B | 2 | Mass Failure | | Left Bank | 27.15 | Height | 10 | ----- | 0 |
T2.11-B | 2 | Mass Failure | | Left Bank | 73.34 | Height | 30 | ----- | 0 |
T2.11-B | 2 | Mass Failure | | Left Bank | 124.12 | Height | 30 | ----- | 0 |
T2.11-B | 2 | Mass Failure | | Right Bank | 51.64 | Height | 40 | ----- | 0 |
T2.11-B | 2 | Mass Failure | | Right Bank | 56.8 | Height | 20 | ----- | 0 |
T2.11-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.11-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 195.59 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Buffers Less than 25 feet | | Right Bank | 47.09 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T2.12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-A | 2 | Encroachment | Road | One Side | 312.25 | Height | 10 | ----- | 0 |
T2.12-A | 2 | Erosion | | Left Bank | 30.15 | Height | 3 | ----- | 0 |
T2.12-A | 2 | Erosion | | Left Bank | 40.07 | Height | 4 | ----- | 0 |
T2.12-A | 2 | Erosion | | Left Bank | 196.91 | Height | 0 | ----- | 0 |
T2.12-A | 2 | Erosion | | Left Bank | 198.4 | Height | 4 | ----- | 0 |
T2.12-A | 2 | Erosion | | Left Bank | 224.34 | Height | 5 | ----- | 0 |
T2.12-A | 2 | Erosion | | Right Bank | 88.5 | Height | 0 | ----- | 0 |
T2.12-A | 2 | Erosion | | Right Bank | 239.29 | Height | 4 | ----- | 0 |
T2.12-A | 2 | Mass Failure | | Right Bank | 30.32 | Height | 10 | ----- | 0 |
T2.12-A | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 55.93 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 75.39 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 123.79 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 46.08 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 58.24 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 99.84 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 12 | ----- | 0 |
T2.12-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 12 | ----- | 0 |
T2.12-B | 2 | Bridge or Culvert | Culvert | | 0 | Length | 120 | ----- | 0 |
T2.12-B | 2 | Buffers Less than 25 feet | | Left Bank | 268.85 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Buffers Less than 25 feet | | Left Bank | 320.98 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T2.12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Development | | One Side | 179.93 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Encroachment | Road | One Side | 622.27 | Height | 3 | ----- | 0 |
T2.12-B | 2 | Erosion | | Left Bank | 39.8 | Height | 5 | ----- | 0 |
T2.12-B | 2 | Erosion | | Left Bank | 51.19 | Height | 3 | ----- | 0 |
T2.12-B | 2 | Erosion | | Right Bank | 32.76 | Height | 2 | ----- | 0 |
T2.12-B | 2 | Erosion | | Right Bank | 56.88 | Height | 3 | ----- | 0 |
T2.12-B | 2 | Erosion | | Right Bank | 240.24 | Height | 8 | ----- | 0 |
T2.12-B | 2 | Grade Control | Weir | Picture | 0 | Height | 2 | HtAbvWater | 1 |
T2.12-B | 2 | Mass Failure | | Left Bank | 32.72 | Height | 10 | ----- | 0 |
T2.12-B | 2 | Mass Failure | | Left Bank | 39.49 | Height | 10 | ----- | 0 |
T2.12-B | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Straightening | Straightening | | 437.28 | ----- | 0 | ----- | 0 |
T2.12-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T2.13-0 | 2 | Buffers Less than 25 feet | | Left Bank | 161.26 | ----- | 0 | ----- | 0 |
T2.13-0 | 2 | Buffers Less than 25 feet | | Right Bank | 495.14 | ----- | 0 | ----- | 0 |
T2.13-0 | 2 | Development | | One Side | 71.31 | ----- | 0 | ----- | 0 |
T2.13-0 | 2 | Development | | One Side | 327.2 | ----- | 0 | ----- | 0 |
T3.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 12.87 | ----- | 0 | ----- | 0 |
T3.03-0 | 2 | Encroachment | Road | One Side | 14.22 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 376.84 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 403.85 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Beaver Dam | | | 0 | Length | 600 | ----- | 0 |
T3.04-0 | 2 | Beaver Dam | | | 0 | Length | 0 | ----- | 0 |
T3.04-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 12 | ----- | 0 |
T3.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 817.59 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 2291.94 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Development | | One Side | 169.1 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Development | | One Side | 255.87 | ----- | 0 | ----- | 0 |
T3.04-0 | 2 | Encroachment | Road | One Side | 2005.6 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Left Bank | 38.54 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Left Bank | 70.52 | Height | 8 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Left Bank | 72.61 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Right Bank | 29.55 | Height | 8 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Right Bank | 31.82 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Right Bank | 62.6 | Height | 6 | ----- | 0 |
T3.04-0 | 2 | Erosion | | Right Bank | 91.46 | Height | 3 | ----- | 0 |
T3.04-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 1 | HtAbvWater | 0 |
T3.04-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 11 | HtAbvWater | 7 |
T3.04-0 | 2 | Straightening | Straightening | | 2680.99 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Buffers Less than 25 feet | | Left Bank | 306.7 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 169.59 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 375.24 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Buffers Less than 25 feet | | Right Bank | 485.97 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.05-0 | 2 | Development | | One Side | 944.63 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Encroachment | Road | Both Sides | 453.75 | Height | 10 | ----- | 0 |
T3.05-0 | 2 | Erosion | | Right Bank | 10.87 | Height | 6 | ----- | 0 |
T3.05-0 | 2 | Erosion | | Right Bank | 25.53 | Height | 4 | ----- | 0 |
T3.05-0 | 2 | Erosion | | Right Bank | 195.89 | Height | 4 | ----- | 0 |
T3.05-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 2 |
T3.05-0 | 2 | Mass Failure | | Right Bank | 81.61 | Height | 15 | ----- | 0 |
T3.05-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.05-0 | 2 | Straightening | Straightening | | 857.15 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 102.96 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 1619.36 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 51.41 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T3.06-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 36 | ----- | 0 |
T3.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 1772.41 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 76.07 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.06-0 | 2 | Development | | One Side | 390.08 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Encroachment | Road | Both Sides | 129.73 | Height | 15 | ----- | 0 |
T3.06-0 | 2 | Encroachment | Road | Both Sides | 138.92 | Height | 10 | ----- | 0 |
T3.06-0 | 2 | Encroachment | Road | One Side | 1497.72 | Height | 15 | ----- | 0 |
T3.06-0 | 2 | Erosion | | Left Bank | 12.15 | Height | 4 | ----- | 0 |
T3.06-0 | 2 | Erosion | | Right Bank | 20.47 | Height | 8 | ----- | 0 |
T3.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 12 | HtAbvWater | 7 |
T3.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 10 | HtAbvWater | 6 |
T3.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 1 |
T3.06-0 | 2 | Mass Failure | | Left Bank | 38.66 | Height | 20 | ----- | 0 |
T3.06-0 | 2 | Mass Failure | | Right Bank | 112.01 | Height | 15 | ----- | 0 |
T3.06-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.06-0 | 2 | Straightening | Straightening | | 1597.75 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 348.89 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 451.89 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 488.66 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 26 | ----- | 0 |
T3.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 475.87 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 835.51 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Development | | Both Sides | 298.73 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Encroachment | Road | Both Sides | 708.4 | Height | 15 | ----- | 0 |
T3.07-0 | 2 | Encroachment | Road | One Side | 84.86 | Height | 10 | ----- | 0 |
T3.07-0 | 2 | Encroachment | Road | One Side | 1147.01 | Height | 15 | ----- | 0 |
T3.07-0 | 2 | Erosion | | Left Bank | 16.77 | Height | 3 | ----- | 0 |
T3.07-0 | 2 | Erosion | | Left Bank | 32.65 | Height | 6 | ----- | 0 |
T3.07-0 | 2 | Erosion | | Left Bank | 60.78 | Height | 3 | ----- | 0 |
T3.07-0 | 2 | Erosion | | Right Bank | 66.57 | Height | 3 | ----- | 0 |
T3.07-0 | 2 | Erosion | | Right Bank | 261.25 | Height | 6 | ----- | 0 |
T3.07-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 7 | HtAbvWater | 5 |
T3.07-0 | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Straightening | Straightening | | 432.89 | ----- | 0 | ----- | 0 |
T3.07-0 | 2 | Straightening | Straightening | | 812.49 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 126.99 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 157.62 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 267.15 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 359.43 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 4 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 17.22 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 94 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 249.29 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 285.43 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 339.27 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 452.91 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 479.35 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 643.99 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.08-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Development | | One Side | 222.33 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Development | | One Side | 295.03 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Development | | One Side | 1392.01 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Encroachment | Berm | One Side | 54.19 | Height | 4 | ----- | 0 |
T3.08-0 | 2 | Encroachment | Berm | One Side | 179.97 | Height | 6 | ----- | 0 |
T3.08-0 | 2 | Encroachment | Road | One Side | 5010.14 | Height | 10 | ----- | 0 |
T3.08-0 | 2 | Erosion | | Left Bank | 57.55 | Height | 4 | ----- | 0 |
T3.08-0 | 2 | Erosion | | Left Bank | 225.22 | Height | 5 | ----- | 0 |
T3.08-0 | 2 | Erosion | | Right Bank | 36.12 | Height | 5 | ----- | 0 |
T3.08-0 | 2 | Flow Regs and Withdrawals | Small Run of River | Other | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 3 | HtAbvWater | 2 |
T3.08-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 3 | HtAbvWater | 1 |
T3.08-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 2 | HtAbvWater | 1 |
T3.08-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 6 |
T3.08-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 1 | HtAbvWater | 0 |
T3.08-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 5 |
T3.08-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 10 | HtAbvWater | 6 |
T3.08-0 | 2 | Grade Control | Weir | Picture | 0 | Height | 6 | HtAbvWater | 1 |
T3.08-0 | 2 | Mass Failure | | Right Bank | 106.31 | Height | 30 | ----- | 0 |
T3.08-0 | 2 | Mass Failure | | Right Bank | 201.1 | Height | 15 | ----- | 0 |
T3.08-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.08-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 8.33 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 128.58 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 147.56 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 158.7 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 168.28 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 187.67 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 552.21 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Buffers Less than 25 feet | | Left Bank | 262.7 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Buffers Less than 25 feet | | Left Bank | 455.07 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Buffers Less than 25 feet | | Left Bank | 589.14 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T3.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Development | | One Side | 9.43 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Development | | One Side | 262.86 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Encroachment | Berm | One Side | 97.01 | Height | 4 | ----- | 0 |
T3.09-0 | 2 | Encroachment | Road | One Side | 4104.64 | Height | 10 | ----- | 0 |
T3.09-0 | 2 | Erosion | | Left Bank | 39.61 | Height | 6 | ----- | 0 |
T3.09-0 | 2 | Erosion | | Left Bank | 45.72 | Height | 3 | ----- | 0 |
T3.09-0 | 2 | Erosion | | Left Bank | 51.71 | Height | 5 | ----- | 0 |
T3.09-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 9 | HtAbvWater | 6 |
T3.09-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 6 |
T3.09-0 | 2 | Gully | | | 0 | Height | 2 | Length | 100 |
T3.09-0 | 2 | Mass Failure | | Left Bank | 134.75 | Height | 15 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 16.52 | Height | 6 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 31.82 | Height | 6 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 36.66 | Height | 15 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 41.3 | Height | 8 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 104.18 | Height | 60 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 134 | Height | 15 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 244.33 | Height | 15 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 245 | Height | 10 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 249.75 | Height | 18 | ----- | 0 |
T3.09-0 | 2 | Mass Failure | | Right Bank | 270.51 | Height | 25 | ----- | 0 |
T3.09-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.09-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 116.1 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T3.10-0 | 2 | Buffers Less than 25 feet | | Left Bank | 260.15 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T3.10-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Development | | One Side | 58.27 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Development | | One Side | 68.17 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Encroachment | Road | One Side | 606.62 | Height | 10 | ----- | 0 |
T3.10-0 | 2 | Erosion | | Right Bank | 62.32 | Height | 2 | ----- | 0 |
T3.10-0 | 2 | Erosion | | Right Bank | 88.73 | Height | 2 | ----- | 0 |
T3.10-0 | 2 | Flow Regs and Withdrawals | Large Run of River | Other | 0 | ----- | 0 | ----- | 0 |
T3.10-0 | 2 | Grade Control | Dam | Picture | 0 | Height | 12 | HtAbvWater | 2 |
T3.10-0 | 2 | Mass Failure | | Right Bank | 38.17 | Height | 10 | ----- | 0 |
T3.10-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 85.85 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.10S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Development | | One Side | 208.36 | ----- | 0 | ----- | 0 |
T3.10S1.01-0 | 2 | Mass Failure | | Left Bank | 168.78 | Height | 20 | ----- | 0 |
T3.10S1.01-0 | 2 | Mass Failure | | Right Bank | 24.5 | Height | 10 | ----- | 0 |
T3.10S1.01-0 | 2 | Mass Failure | | Right Bank | 28.99 | Height | 10 | ----- | 0 |
T3.10S1.01-0 | 2 | Mass Failure | | Right Bank | 121.5 | Height | 30 | ----- | 0 |
T3.10S1.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 262.79 | ----- | 0 | ----- | 0 |
T3.10S1.02-0 | 2 | Erosion | | Left Bank | 236.49 | Height | 4 | ----- | 0 |
T3.10S1.02-0 | 2 | Flow Regs and Withdrawals | Small Run of River | Other | 0 | ----- | 0 | ----- | 0 |
T3.10S1.02-0 | 2 | Grade Control | Weir | Picture | 0 | Height | 6 | HtAbvWater | 1 |
T3.10S1.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 365.58 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 42 | ----- | 0 |
T3.10S1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 216.15 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 235.43 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 242.01 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 355.98 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.10S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Development | | One Side | 15.15 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Encroachment | Berm | One Side | 197.11 | Height | 5 | ----- | 0 |
T3.10S1.03-0 | 2 | Encroachment | Road | One Side | 370.11 | Height | 10 | ----- | 0 |
T3.10S1.03-0 | 2 | Encroachment | Road | One Side | 837.25 | Height | 15 | ----- | 0 |
T3.10S1.03-0 | 2 | Erosion | | Left Bank | 58.68 | Height | 6 | ----- | 0 |
T3.10S1.03-0 | 2 | Erosion | | Left Bank | 216.38 | Height | 9 | ----- | 0 |
T3.10S1.03-0 | 2 | Erosion | | Right Bank | 35.92 | Height | 8 | ----- | 0 |
T3.10S1.03-0 | 2 | Erosion | | Right Bank | 37.1 | Height | 6 | ----- | 0 |
T3.10S1.03-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 5 |
T3.10S1.03-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 4 |
T3.10S1.03-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 12 | HtAbvWater | 9 |
T3.10S1.03-0 | 2 | Gully | | | 0 | Height | 3 | Length | 60 |
T3.10S1.03-0 | 2 | Gully | | | 0 | Height | 5 | Length | 80 |
T3.10S1.03-0 | 2 | Mass Failure | | Left Bank | 19.37 | Height | 20 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 59.84 | Height | 25 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 60.58 | Height | 20 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 80.94 | Height | 15 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 107.21 | Height | 20 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 168.3 | Height | 60 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 176.78 | Height | 15 | ----- | 0 |
T3.10S1.03-0 | 2 | Mass Failure | | Right Bank | 183.63 | Height | 40 | ----- | 0 |
T3.10S1.03-0 | 2 | Migration | Braiding | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.03-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.04-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 30 | ----- | 0 |
T3.10S1.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 372.01 | ----- | 0 | ----- | 0 |
T3.10S1.04-0 | 2 | Development | | One Side | 52.91 | ----- | 0 | ----- | 0 |
T3.10S1.04-0 | 2 | Development | | One Side | 181.34 | ----- | 0 | ----- | 0 |
T3.10S1.04-0 | 2 | Encroachment | Road | One Side | 66.25 | Height | 15 | ----- | 0 |
T3.10S1.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.10S1.05-0 | 2 | Flow Regs and Withdrawals | Small Run of River | Recreation | 0 | ----- | 0 | ----- | 0 |
T3.10S1.05-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 4 | HtAbvWater | 4 |
T3.10S1.3s1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 38.97 | ----- | 0 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 49.88 | ----- | 0 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 151 | ----- | 0 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 130.88 | ----- | 0 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 283.85 | ----- | 0 | ----- | 0 |
T3.10S1.3s1.02-0 | 2 | Development | | One Side | 203.54 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 54.64 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 45.31 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 95.02 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 98.65 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 114.69 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T3.11-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 24 | ----- | 0 |
T3.11-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 25 | ----- | 0 |
T3.11-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 6 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Left Bank | 952.74 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 157.95 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 209.49 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 505.47 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 753.06 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Buffers Less than 25 feet | | Right Bank | 919.31 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Development | | One Side | 217.54 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Development | | One Side | 812.64 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Encroachment | Road | One Side | 503.01 | Height | 10 | ----- | 0 |
T3.11-0 | 2 | Erosion | | Right Bank | 43.44 | Height | 3 | ----- | 0 |
T3.11-0 | 2 | Erosion | | Right Bank | 53.52 | Height | 2 | ----- | 0 |
T3.11-0 | 2 | Flow Regs and Withdrawals | Small Run of River | Other | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 6 |
T3.11-0 | 2 | Grade Control | Weir | Picture | 0 | Height | 5 | HtAbvWater | 1 |
T3.11-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.11-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T3.11S1.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 20 | ----- | 0 |
T3.11S1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 343.09 | ----- | 0 | ----- | 0 |
T3.11S1.01-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 4 | HtAbvWater | 4 |
T3.11S1.01-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T3.12-0 | 2 | Buffers Less than 25 feet | | Right Bank | 250.79 | ----- | 0 | ----- | 0 |
T3.14-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 24 | ----- | 0 |
T3.14-0 | 2 | Grade Control | Dam | No Picture | 0 | Height | 4 | HtAbvWater | 4 |
T3.7S1.01-A | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Bridge or Culvert | Culvert | | 0 | Length | 80 | ----- | 0 |
T3.7S1.01-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.01-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Development | | One Side | 330.91 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Encroachment | Road | One Side | 777.46 | Height | 6 | ----- | 0 |
T3.7S1.01-A | 2 | Mass Failure | | Right Bank | 35.08 | Height | 10 | ----- | 0 |
T3.7S1.01-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 188.67 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 346.77 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 27.7 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 45.79 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 156.52 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 16 | ----- | 0 |
T3.7S1.01-B | 2 | Buffers Less than 25 feet | | Left Bank | 112.56 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Buffers Less than 25 feet | | Left Bank | 115.04 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Buffers Less than 25 feet | | Left Bank | 223.01 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Development | | One Side | 407.35 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Encroachment | Road | One Side | 2300.01 | Height | 6 | ----- | 0 |
T3.7S1.01-B | 2 | Flow Regs and Withdrawals | Small Run of River | Other | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Grade Control | Ledge | No Picture | 0 | Height | 6 | HtAbvWater | 5 |
T3.7S1.01-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 4 |
T3.7S1.01-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 2 |
T3.7S1.01-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 16 | HtAbvWater | 13 |
T3.7S1.01-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 12 | HtAbvWater | 10 |
T3.7S1.01-B | 2 | Grade Control | Weir | Picture | 0 | Height | 4 | HtAbvWater | 4 |
T3.7S1.01-B | 2 | Mass Failure | | Right Bank | 18.76 | Height | 8 | ----- | 0 |
T3.7S1.01-B | 2 | Mass Failure | | Right Bank | 32.75 | Height | 15 | ----- | 0 |
T3.7S1.01-B | 2 | Mass Failure | | Right Bank | 83.12 | Height | 18 | ----- | 0 |
T3.7S1.01-B | 2 | Mass Failure | | Right Bank | 85.46 | Height | 30 | ----- | 0 |
T3.7S1.01-B | 2 | Mass Failure | | Right Bank | 153.38 | Height | 40 | ----- | 0 |
T3.7S1.01-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.01-B | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 487.91 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 45.85 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 419.51 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Encroachment | Berm | One Side | 142.95 | Height | 6 | ----- | 0 |
T3.7S1.02-0 | 2 | Erosion | | Left Bank | 75.32 | Height | 8 | ----- | 0 |
T3.7S1.02-0 | 2 | Erosion | | Left Bank | 141.78 | Height | 10 | ----- | 0 |
T3.7S1.02-0 | 2 | Erosion | | Left Bank | 184.67 | Height | 8 | ----- | 0 |
T3.7S1.02-0 | 2 | Erosion | | Right Bank | 32.11 | Height | 6 | ----- | 0 |
T3.7S1.02-0 | 2 | Gully | | | 0 | Height | 2 | Length | 100 |
T3.7S1.02-0 | 2 | Gully | | | 0 | Height | 2 | Length | 60 |
T3.7S1.02-0 | 2 | Mass Failure | | Left Bank | 49.49 | Height | 12 | ----- | 0 |
T3.7S1.02-0 | 2 | Mass Failure | | Right Bank | 43.85 | Height | 20 | ----- | 0 |
T3.7S1.02-0 | 2 | Mass Failure | | Right Bank | 71.59 | Height | 30 | ----- | 0 |
T3.7S1.02-0 | 2 | Mass Failure | | Right Bank | 135.15 | Height | 15 | ----- | 0 |
T3.7S1.02-0 | 2 | Mass Failure | | Right Bank | 156.02 | Height | 20 | ----- | 0 |
T3.7S1.02-0 | 2 | Migration | Avulsion | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.02-0 | 2 | Straightening | Straightening | | 562.7 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Beaver Dam | | | 0 | Length | 150 | ----- | 0 |
T3.7S1.03-0 | 2 | Beaver Dam | | | 0 | Length | 200 | ----- | 0 |
T3.7S1.03-0 | 2 | Beaver Dam | | | 0 | Length | 150 | ----- | 0 |
T3.7S1.03-0 | 2 | Beaver Dam | | | 0 | Length | 300 | ----- | 0 |
T3.7S1.03-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Encroachment | Road | One Side | 563.36 | Height | 10 | ----- | 0 |
T3.7S1.03-0 | 2 | Erosion | | Left Bank | 11.03 | Height | 4 | ----- | 0 |
T3.7S1.03-0 | 2 | Erosion | | Left Bank | 39.08 | Height | 3 | ----- | 0 |
T3.7S1.03-0 | 2 | Erosion | | Right Bank | 38.62 | Height | 3 | ----- | 0 |
T3.7S1.03-0 | 2 | Erosion | | Right Bank | 43.65 | Height | 3 | ----- | 0 |
T3.7S1.03-0 | 2 | Mass Failure | | Right Bank | 47.97 | Height | 8 | ----- | 0 |
T3.7S1.03-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.03-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Alluvial Fan | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 18 | ----- | 0 |
T3.7S1.04-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 120 | ----- | 0 |
T3.7S1.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 253.55 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 310.03 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Encroachment | Road | One Side | 866.75 | Height | 10 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Left Bank | 28.59 | Height | 4 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Left Bank | 67.64 | Height | 3 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Right Bank | 32.46 | Height | 3 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Right Bank | 59.6 | Height | 3 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Right Bank | 65.01 | Height | 3 | ----- | 0 |
T3.7S1.04-0 | 2 | Erosion | | Right Bank | 107.77 | Height | 3 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.04-0 | 2 | Straightening | Straightening | | 191.98 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 55.85 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 10 | ----- | 0 |
T3.7S1.05-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 80 | ----- | 0 |
T3.7S1.05-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Left Bank | 32.94 | Height | 4 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Left Bank | 34.34 | Height | 3 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Left Bank | 54.4 | Height | 4 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Right Bank | 22.83 | Height | 6 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Right Bank | 23.65 | Height | 4 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Right Bank | 88.73 | Height | 4 | ----- | 0 |
T3.7S1.05-0 | 2 | Erosion | | Right Bank | 118.51 | Height | 4 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 23.72 | Height | 8 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 25.18 | Height | 8 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 34.38 | Height | 8 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 38.37 | Height | 8 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 41.92 | Height | 6 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Left Bank | 84.52 | Height | 15 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Right Bank | 25.85 | Height | 20 | ----- | 0 |
T3.7S1.05-0 | 2 | Mass Failure | | Right Bank | 36.41 | Height | 15 | ----- | 0 |
T3.7S1.05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.05-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 22.89 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 33.73 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 36.07 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 43.26 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 53.94 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 78.89 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 12 | ----- | 0 |
T3.7S1.06-A | 2 | Buffers Less than 25 feet | | Left Bank | 71.25 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Buffers Less than 25 feet | | Left Bank | 990.27 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Buffers Less than 25 feet | | Right Bank | 1233.13 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Erosion | | Left Bank | 72.37 | Height | 3 | ----- | 0 |
T3.7S1.06-A | 2 | Erosion | | Left Bank | 75.23 | Height | 3 | ----- | 0 |
T3.7S1.06-A | 2 | Erosion | | Right Bank | 18.45 | Height | 3 | ----- | 0 |
T3.7S1.06-A | 2 | Erosion | | Right Bank | 73.45 | Height | 4 | ----- | 0 |
T3.7S1.06-A | 2 | Migration | Migration | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Straightening | Straightening | | 203.06 | ----- | 0 | ----- | 0 |
T3.7S1.06-A | 2 | Straightening | Straightening | | 249.68 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 9 | ----- | 0 |
T3.7S1.06-B | 2 | Bridge or Culvert | Culvert | | 0 | Length | 80 | ----- | 0 |
T3.7S1.06-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Erosion | | Left Bank | 22.5 | Height | 3 | ----- | 0 |
T3.7S1.06-B | 2 | Erosion | | Left Bank | 305.01 | Height | 8 | ----- | 0 |
T3.7S1.06-B | 2 | Erosion | | Right Bank | 55.76 | Height | 4 | ----- | 0 |
T3.7S1.06-B | 2 | Erosion | | Right Bank | 305.6 | Height | 8 | ----- | 0 |
T3.7S1.06-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.06-B | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 81.67 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 123.98 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 26.3 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 304.84 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 180 | ----- | 0 |
T3.7S1.07-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 80 | ----- | 0 |
T3.7S1.07-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 60 | ----- | 0 |
T3.7S1.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 183.01 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 198.43 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 171.13 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 179.04 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 295.83 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Development | | One Side | 130.73 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Development | | One Side | 492.58 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Encroachment | Road | One Side | 225.05 | Height | 25 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Left Bank | 29.77 | Height | 6 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Left Bank | 30.09 | Height | 4 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Left Bank | 39.65 | Height | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Right Bank | 33.21 | Height | 4 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Right Bank | 33.53 | Height | 10 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Right Bank | 34.09 | Height | 3 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Right Bank | 39.06 | Height | 5 | ----- | 0 |
T3.7S1.07-0 | 2 | Erosion | | Right Bank | 53.1 | Height | 4 | ----- | 0 |
T3.7S1.07-0 | 2 | Mass Failure | | Left Bank | 39.01 | Height | 15 | ----- | 0 |
T3.7S1.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Steep Riffle or Head Cut | Head Cut | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Stormwater Input | Field Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Straightening | Straightening | | 125.34 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T3.7S1.07-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 46.68 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 128.96 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 140.86 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 14.01 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 77.84 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 95.24 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 227.11 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 28 | ----- | 0 |
T4.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 25 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 193.5 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 197.35 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 252.25 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 277.56 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 283.33 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 798.64 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 163.76 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 291.77 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 932.33 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T4.01-0 | 2 | Development | | One Side | 740.32 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Encroachment | Berm | One Side | 310.62 | Height | 3 | ----- | 0 |
T4.01-0 | 2 | Encroachment | Berm | One Side | 347.91 | Height | 2 | ----- | 0 |
T4.01-0 | 2 | Encroachment | Road | One Side | 587.71 | Height | 10 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 38.39 | Height | 5 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 39.66 | Height | 4 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 43.53 | Height | 3 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 92.98 | Height | 6 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 94.1 | Height | 4 | ----- | 0 |
T4.01-0 | 2 | Erosion | | Left Bank | 120.93 | Height | 4 | ----- | 0 |
T4.01-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 6 |
T4.01-0 | 2 | Gully | | | 0 | Height | 2 | Length | 15 |
T4.01-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Straightening | Straightening | | 408.41 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Straightening | Straightening | | 410.88 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Straightening | Straightening | | 805.39 | ----- | 0 | ----- | 0 |
T4.01-0 | 2 | Straightening | Straightening | | 1040.44 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 198.45 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 172.4 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 270.47 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T4.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Development | | One Side | 215.38 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Development | | One Side | 308.93 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Development | | One Side | 1043.69 | ----- | 0 | ----- | 0 |
T4.02-0 | 2 | Encroachment | Road | One Side | 932.88 | Height | 0 | ----- | 0 |
T4.02-0 | 2 | Encroachment | Road | One Side | 1298.52 | Height | 10 | ----- | 0 |
T4.02-0 | 2 | Erosion | | Left Bank | 25.03 | Height | 7 | ----- | 0 |
T4.02-0 | 2 | Erosion | | Left Bank | 73.33 | Height | 4 | ----- | 0 |
T4.02-0 | 2 | Erosion | | Left Bank | 89.28 | Height | 8 | ----- | 0 |
T4.02-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 2 | HtAbvWater | 2 |
T4.02-0 | 2 | Gully | | | 0 | Height | 3 | Length | 250 |
T4.02-0 | 2 | Mass Failure | | Left Bank | 12.28 | Height | 20 | ----- | 0 |
T4.02-0 | 2 | Mass Failure | | Left Bank | 71.88 | Height | 50 | ----- | 0 |
T4.02-0 | 2 | Mass Failure | | Left Bank | 122.1 | Height | 15 | ----- | 0 |
T4.02-0 | 2 | Mass Failure | | Left Bank | 139.82 | Height | 25 | ----- | 0 |
T4.02-0 | 2 | Mass Failure | | Left Bank | 156.1 | Height | 15 | ----- | 0 |
T4.02-0 | 2 | Mass Failure | | Right Bank | 35.26 | Height | 10 | ----- | 0 |
T4.03-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 371.28 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Bridge or Culvert | Bridge | | 0 | Length | 23 | ----- | 0 |
T4.03-A | 2 | Buffers Less than 25 feet | | Left Bank | 59.35 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T4.03-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Development | | One Side | 202.8 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Encroachment | Berm | One Side | 86.73 | Height | 5 | ----- | 0 |
T4.03-A | 2 | Encroachment | Berm | One Side | 147.85 | Height | 8 | ----- | 0 |
T4.03-A | 2 | Encroachment | Road | One Side | 891.24 | Height | 10 | ----- | 0 |
T4.03-A | 2 | Erosion | | Left Bank | 29.51 | Height | 5 | ----- | 0 |
T4.03-A | 2 | Grade Control | Ledge | No Picture | 0 | Height | 2 | HtAbvWater | 1 |
T4.03-A | 2 | Mass Failure | | Left Bank | 37.49 | Height | 20 | ----- | 0 |
T4.03-A | 2 | Mass Failure | | Right Bank | 223.64 | Height | 40 | ----- | 0 |
T4.03-A | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.03-A | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 67.8 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 18.71 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Bridge or Culvert | Bridge | | 0 | Length | 34 | ----- | 0 |
T4.03-B | 2 | Bridge or Culvert | Culvert | | 0 | Length | 60 | ----- | 0 |
T4.03-B | 2 | Buffers Less than 25 feet | | Left Bank | 139.39 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Buffers Less than 25 feet | | Left Bank | 277.9 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Buffers Less than 25 feet | | Right Bank | 161.33 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Buffers Less than 25 feet | | Right Bank | 341.01 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T4.03-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Development | | One Side | 189.21 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Development | | One Side | 309.15 | ----- | 0 | ----- | 0 |
T4.03-B | 2 | Erosion | | Left Bank | 29.6 | Height | 8 | ----- | 0 |
T4.03-B | 2 | Erosion | | Left Bank | 44.59 | Height | 8 | ----- | 0 |
T4.03-B | 2 | Erosion | | Left Bank | 56.85 | Height | 6 | ----- | 0 |
T4.03-B | 2 | Erosion | | Left Bank | 65.9 | Height | 8 | ----- | 0 |
T4.03-B | 2 | Erosion | | Right Bank | 15.36 | Height | 8 | ----- | 0 |
T4.03-B | 2 | Erosion | | Right Bank | 24.87 | Height | 6 | ----- | 0 |
T4.03-B | 2 | Erosion | | Right Bank | 34.96 | Height | 4 | ----- | 0 |
T4.03-B | 2 | Erosion | | Right Bank | 142.34 | Height | 9 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Left Bank | 14.16 | Height | 25 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Left Bank | 57.19 | Height | 15 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Left Bank | 65.8 | Height | 12 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Left Bank | 195.67 | Height | 120 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Right Bank | 17.64 | Height | 20 | ----- | 0 |
T4.03-B | 2 | Mass Failure | | Right Bank | 63.91 | Height | 0 | ----- | 0 |
T4.03-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 17.68 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 45.99 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 18.29 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 74.54 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 142.36 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 23 | ----- | 0 |
T4.04-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 23 | ----- | 0 |
T4.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 86.54 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 179.67 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 269.01 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 329.17 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 347.73 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T4.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Development | | Both Sides | 481.38 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Development | | One Side | 200.5 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Development | | One Side | 307.96 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Encroachment | Road | One Side | 273.59 | Height | 10 | ----- | 0 |
T4.04-0 | 2 | Erosion | | Right Bank | 134.68 | Height | 4 | ----- | 0 |
T4.04-0 | 2 | Mass Failure | | Left Bank | 70.65 | Height | 12 | ----- | 0 |
T4.04-0 | 2 | Migration | Neck Cutoff | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Straightening | Straightening | | 440.92 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Straightening | Straightening | | 557.85 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T4.04-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 73.24 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 119.58 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 24 | ----- | 0 |
T4.2S1.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 112.39 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 193.01 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 90.41 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 119.87 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T4.2S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Development | | One Side | 87.45 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Development | | One Side | 214.07 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Erosion | | Left Bank | 74.27 | Height | 10 | ----- | 0 |
T4.2S1.01-0 | 2 | Erosion | | Right Bank | 53.22 | Height | 6 | ----- | 0 |
T4.2S1.01-0 | 2 | Mass Failure | | Left Bank | 21.63 | Height | 20 | ----- | 0 |
T4.2S1.01-0 | 2 | Mass Failure | | Left Bank | 74.65 | Height | 25 | ----- | 0 |
T4.2S1.01-0 | 2 | Mass Failure | | Right Bank | 10.87 | Height | 15 | ----- | 0 |
T4.2S1.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Straightening | Straightening | | 156.64 | ----- | 0 | ----- | 0 |
T4.2S1.01-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T4.2S1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 96.87 | ----- | 0 | ----- | 0 |
T4.2S1.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 95.04 | ----- | 0 | ----- | 0 |
T4.2S1.02-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T4.2S1.02-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 15 | ----- | 0 |
T4.2S1.03-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 30 | ----- | 0 |
T4.2S1.03-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 15 | ----- | 0 |
T4.2S1.03-0 | 2 | Development | | One Side | 202.66 | ----- | 0 | ----- | 0 |
T4.2S1.03-0 | 2 | Encroachment | Road | Both Sides | 545.66 | Height | 0 | ----- | 0 |
T4.2S1.03-0 | 2 | Encroachment | Road | One Side | 1392.85 | Height | 0 | ----- | 0 |
T4.2S1.04-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 30 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 891.25 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 890.41 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 98 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 156.02 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 19.9 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 102.13 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 156.07 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 28 | ----- | 0 |
T5.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 310 | ----- | 0 |
T5.01-0 | 2 | Bridge or Culvert | Culvert | | 0 | Length | 26 | ----- | 0 |
T5.01-0 | 2 | Buffers Less than 25 feet | | Left Bank | 212.69 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Buffers Less than 25 feet | | Right Bank | 737.67 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.01-0 | 2 | Development | | One Side | 205.1 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Encroachment | Road | One Side | 807.45 | Height | 20 | ----- | 0 |
T5.01-0 | 2 | Erosion | | Left Bank | 12.68 | Height | 3 | ----- | 0 |
T5.01-0 | 2 | Mass Failure | | Left Bank | 20.39 | Height | 10 | ----- | 0 |
T5.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Stormwater Input | Urban Stormwater Pipe | | 0 | ----- | 0 | ----- | 0 |
T5.01-0 | 2 | Straightening | Straightening | | 1527.81 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 22.47 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Hard Bank | Left Bank | 33.46 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 19.19 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 36.47 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Hard Bank | Right Bank | 65.81 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 38.74 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 42.29 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 48.01 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 49.98 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 315.13 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 86.94 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 89.71 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 134.87 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 172.51 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 25 | ----- | 0 |
T5.02-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 22 | ----- | 0 |
T5.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 170.05 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 198.76 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Buffers Less than 25 feet | | Left Bank | 274.39 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 184.9 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Buffers Less than 25 feet | | Right Bank | 490.18 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.02-0 | 2 | Development | | One Side | 204.11 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Development | | One Side | 210.78 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Development | | One Side | 724.56 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Dredging | Dredging | General Location | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Encroachment | Berm | One Side | 165.34 | Height | 2 | ----- | 0 |
T5.02-0 | 2 | Encroachment | Road | One Side | 325.34 | Height | 20 | ----- | 0 |
T5.02-0 | 2 | Erosion | | Left Bank | 14.73 | Height | 6 | ----- | 0 |
T5.02-0 | 2 | Erosion | | Left Bank | 74.11 | Height | 4 | ----- | 0 |
T5.02-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 15 | HtAbvWater | 9 |
T5.02-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 18 | HtAbvWater | 15 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.02-0 | 2 | Straightening | Straightening | | 486.96 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 33.1 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 90.59 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 92.29 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 203.57 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 425.77 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 449.6 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 54.95 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 304.67 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 328.94 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 333.34 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Left Bank | 361.09 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 42.38 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 76.01 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Buffers Less than 25 feet | | Right Bank | 144.72 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.03-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Development | | One Side | 298.43 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Development | | One Side | 307.38 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Development | | One Side | 324.44 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Encroachment | Road | One Side | 635.5 | Height | 0 | ----- | 0 |
T5.03-0 | 2 | Encroachment | Road | One Side | 1031.06 | Height | 0 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 16.34 | Height | 8 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 17.24 | Height | 8 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 19.11 | Height | 6 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 32.58 | Height | 6 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 33.32 | Height | 4 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Left Bank | 61.74 | Height | 5 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Right Bank | 18.7 | Height | 8 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Right Bank | 25.84 | Height | 5 | ----- | 0 |
T5.03-0 | 2 | Erosion | | Right Bank | 37.97 | Height | 5 | ----- | 0 |
T5.03-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 2 |
T5.03-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 0 |
T5.03-0 | 2 | Mass Failure | | Left Bank | 41 | Height | 18 | ----- | 0 |
T5.03-0 | 2 | Mass Failure | | Left Bank | 91.37 | Height | 25 | ----- | 0 |
T5.03-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.03-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 140.54 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 268.46 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Buffers Less than 25 feet | | Left Bank | 400.99 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Buffers Less than 25 feet | | Right Bank | 167.71 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Cross Section Location | Representative | | 0 | Number | 0 | ----- | 0 |
T5.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Development | | One Side | 192.54 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Development | | One Side | 207.14 | ----- | 0 | ----- | 0 |
T5.04-0 | 2 | Encroachment | Road | One Side | 591.68 | Height | 0 | ----- | 0 |
T5.04-0 | 2 | Erosion | | Left Bank | 47.15 | Height | 5 | ----- | 0 |
T5.04-0 | 2 | Erosion | | Left Bank | 56.76 | Height | 3 | ----- | 0 |
T5.04-0 | 2 | Erosion | | Right Bank | 172.24 | Height | 2 | ----- | 0 |
T5.04-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 4 |
T5.04-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 2 |
T5.04-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 2 |
T5.04-0 | 2 | Gully | | | 0 | Height | 2 | Length | 60 |
T5.04-0 | 2 | Gully | | | 0 | Height | 2 | Length | 60 |
T5.04-0 | 2 | Gully | | | 0 | Height | 2 | Length | 60 |
T5.04-0 | 2 | Mass Failure | | Left Bank | 69.86 | Height | 18 | ----- | 0 |
T5.04-0 | 2 | Mass Failure | | Right Bank | 14.1 | Height | 8 | ----- | 0 |
T5.04-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 59.51 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 100.06 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Buffers Less than 25 feet | | Left Bank | 175.15 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Buffers Less than 25 feet | | Left Bank | 683 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Buffers Less than 25 feet | | Right Bank | 204.57 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Buffers Less than 25 feet | | Right Bank | 545.85 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.05-A | 2 | Development | | One Side | 435.37 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Erosion | | Left Bank | 20.11 | Height | 0 | ----- | 0 |
T5.05-A | 2 | Erosion | | Left Bank | 150.46 | Height | 3 | ----- | 0 |
T5.05-A | 2 | Erosion | | Right Bank | 15.62 | Height | 4 | ----- | 0 |
T5.05-A | 2 | Erosion | | Right Bank | 24.38 | Height | 6 | ----- | 0 |
T5.05-A | 2 | Erosion | | Right Bank | 31.41 | Height | 2 | ----- | 0 |
T5.05-A | 2 | Erosion | | Right Bank | 39.56 | Height | 10 | ----- | 0 |
T5.05-A | 2 | Grade Control | Ledge | No Picture | 0 | Height | 1 | HtAbvWater | 0 |
T5.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 2 |
T5.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 2 | HtAbvWater | 0 |
T5.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 1 | HtAbvWater | 0 |
T5.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 2 |
T5.05-A | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 4 |
T5.05-A | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Straightening | Straightening | | 559.06 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T5.05-A | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Buffers Less than 25 feet | | Left Bank | 125.92 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Buffers Less than 25 feet | | Left Bank | 142.05 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.05-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Development | | One Side | 81.86 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Development | | One Side | 162.85 | ----- | 0 | ----- | 0 |
T5.05-B | 2 | Encroachment | Road | One Side | 809.81 | Height | 6 | ----- | 0 |
T5.05-B | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 5 |
T5.05-B | 2 | Mass Failure | | Left Bank | 12.59 | Height | 5 | ----- | 0 |
T5.05-B | 2 | Mass Failure | | Left Bank | 13.49 | Height | 10 | ----- | 0 |
T5.05-B | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 18.19 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 28.39 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 30.18 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 19.13 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 19.73 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 145.85 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 25 | ----- | 0 |
T5.06-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 30 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 65.94 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 97.39 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 111.63 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 217.27 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Left Bank | 222.29 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 87.12 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Buffers Less than 25 feet | | Right Bank | 306.71 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.06-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Development | | One Side | 82.22 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Development | | One Side | 149.92 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Development | | One Side | 151.57 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Development | | One Side | 203.78 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Encroachment | Road | One Side | 716.21 | Height | 6 | ----- | 0 |
T5.06-0 | 2 | Encroachment | Road | One Side | 731.69 | Height | 0 | ----- | 0 |
T5.06-0 | 2 | Erosion | | Left Bank | 16.08 | Height | 3 | ----- | 0 |
T5.06-0 | 2 | Erosion | | Left Bank | 31.76 | Height | 5 | ----- | 0 |
T5.06-0 | 2 | Erosion | | Left Bank | 33.14 | Height | 5 | ----- | 0 |
T5.06-0 | 2 | Erosion | | Right Bank | 25.22 | Height | 4 | ----- | 0 |
T5.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 9 | HtAbvWater | 5 |
T5.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 3 |
T5.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 5 | HtAbvWater | 1 |
T5.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 7 | HtAbvWater | 4 |
T5.06-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 4 | HtAbvWater | 1 |
T5.06-0 | 2 | Mass Failure | | Right Bank | 81.77 | Height | 15 | ----- | 0 |
T5.06-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.06-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 41.91 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 45.14 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 51.37 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 54.48 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 192.15 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 6 | ----- | 0 |
T5.07-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 20 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 153.32 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Left Bank | 184.51 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 131.43 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 264.85 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1073.37 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1075.6 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Buffers Less than 25 feet | | Right Bank | 1226.26 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Cross Section Location | Representative | | 0 | Number | 1 | ----- | 0 |
T5.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Debris Jam | | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Development | | Both Sides | 387.52 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Development | | One Side | 77.49 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Development | | One Side | 310.08 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Development | | One Side | 411.23 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Development | | One Side | 729.66 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Encroachment | Berm | Both Sides | 209.24 | Height | 1 | ----- | 0 |
T5.07-0 | 2 | Encroachment | Berm | One Side | 131.45 | Height | 2 | ----- | 0 |
T5.07-0 | 2 | Encroachment | Road | One Side | 42.38 | Height | 0 | ----- | 0 |
T5.07-0 | 2 | Encroachment | Road | One Side | 505.2 | Height | 10 | ----- | 0 |
T5.07-0 | 2 | Encroachment | Road | One Side | 800.91 | Height | 10 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Left Bank | 13.8 | Height | 2 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Left Bank | 30.95 | Height | 3 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Left Bank | 34.39 | Height | 4 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Left Bank | 140.67 | Height | 7 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Right Bank | 30.42 | Height | 5 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Right Bank | 35.81 | Height | 4 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Right Bank | 46.73 | Height | 5 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Right Bank | 76.85 | Height | 4 | ----- | 0 |
T5.07-0 | 2 | Erosion | | Right Bank | 94.58 | Height | 6 | ----- | 0 |
T5.07-0 | 2 | Flow Regs and Withdrawals | Small Withdrawal | Drinking | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Grade Control | Ledge | No Picture | 0 | Height | 4 | HtAbvWater | 1 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 9 | HtAbvWater | 5 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 3 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 12 | HtAbvWater | 10 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 8 | HtAbvWater | 6 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 3 | HtAbvWater | 0 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 6 | HtAbvWater | 3 |
T5.07-0 | 2 | Grade Control | Ledge | Picture | 0 | Height | 2 | HtAbvWater | 0 |
T5.07-0 | 2 | Migration | Flood Chute | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Steep Riffle or Head Cut | Steep Riffle | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Stormwater Input | Road Ditch | | 0 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Straightening | Straightening | | 582.1 | ----- | 0 | ----- | 0 |
T5.07-0 | 2 | Stream Crossing | Stream Ford | | 0 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Left Bank | 134.47 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Bank Armoring or Revetment | Rip-Rap | Right Bank | 754.98 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Bridge or Culvert | Bridge | | 0 | Length | 40 | ----- | 0 |
T5.08-0 | 2 | Buffers Less than 25 feet | | Left Bank | 196.84 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Buffers Less than 25 feet | | Right Bank | 763.31 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Development | | One Side | 50.65 | ----- | 0 | ----- | 0 |
T5.08-0 | 2 | Encroachment | Road | One Side | 1862.21 | Height | 10 | ----- | 0 |