Skip Navigation LinksHome > Projects List > Phase 1 >

Browns River Tribs

Data stored from FIT file

Return to File List

Version: 4.56

ReachPhaseImpactSub ImpactLocationLength (ft.)Name 1Value 1Name 2Value 2
M15S2.01-02Bank Armoring or RevetmentHard BankRight Bank22.57-----0-----0
M15S2.01-02Bank Armoring or RevetmentRip-RapLeft Bank108.86-----0-----0
M15S2.01-02Beaver Dam  0Length950-----0
M15S2.01-02Beaver Dam  0Length750-----0
M15S2.01-02Beaver Dam  0Length250-----0
M15S2.01-02Beaver Dam  0Length1150-----0
M15S2.01-02Bridge or CulvertCulvert 0Length52-----0
M15S2.01-02Bridge or CulvertCulvert 0Length40-----0
M15S2.01-02Bridge or CulvertCulvert 0Length28-----0
M15S2.01-02Buffers Less than 25 feet Left Bank193.1-----0-----0
M15S2.01-02Buffers Less than 25 feet Left Bank242.4-----0-----0
M15S2.01-02Buffers Less than 25 feet Left Bank446.6-----0-----0
M15S2.01-02Cross Section LocationRepresentative 0Number1-----0
M15S2.01-02Debris Jam  0-----0-----0
M15S2.01-02Debris Jam  0-----0-----0
M15S2.01-02Development Both Sides292.08-----0-----0
M15S2.01-02Development One Side1010.23-----0-----0
M15S2.01-02Grade ControlWaterfallPicture0Height15HtAbvWater15
M15S2.01-02StraighteningStraightening 1189.1-----0-----0
M19S1.01-A2Beaver Dam  0Length35-----0
M19S1.01-A2Beaver Dam  0Length90-----0
M19S1.01-A2Beaver Dam  0Length155-----0
M19S1.01-A2Beaver Dam  0Length175-----0
M19S1.01-A2Beaver Dam  0Length110-----0
M19S1.01-A2Beaver Dam  0Length100-----0
M19S1.01-A2Beaver Dam  0Length75-----0
M19S1.01-A2Beaver Dam  0Length75-----0
M19S1.01-B2Bridge or CulvertBridge 0Length38-----0
M19S1.01-B2Buffers Less than 25 feet Left Bank3.13-----0-----0
M19S1.01-B2Cross Section LocationRepresentative 0Number1-----0
M19S1.01-B2Debris Jam  0-----0-----0
M19S1.01-B2Debris Jam  0-----0-----0
M19S1.01-B2Debris Jam  0-----0-----0
M19S1.01-B2Debris Jam  0-----0-----0
M19S1.01-B2Debris Jam  0-----0-----0
M19S1.01-B2Erosion Left Bank72.52Height3-----0
M19S1.01-B2MigrationFlood Chute 0-----0-----0
M19S1.01-C2Buffers Less than 25 feet Left Bank1412.84-----0-----0
M19S1.01-C2Buffers Less than 25 feet Right Bank261.26-----0-----0
M19S1.01-C2Cross Section LocationRepresentative 0Number1-----0
M19S1.01-C2Erosion Left Bank109.03Height3-----0
M19S1.01-C2Flow Regs and WithdrawalsSmall WithdrawalRecreation0-----0-----0
M19S1.01-C2Flow Regs and WithdrawalsSmall WithdrawalRecreation0-----0-----0
M19S1.01-C2Mass Failure Right Bank45.31Height10-----0
M19S1.01-C2StraighteningStraightening 326.87-----0-----0
M19S1.01-C2StraighteningStraightening 936.33-----0-----0