Skip Navigation LinksHome > Projects List > Phase 1 >

Crosby Brook

Data stored from FIT file

Return to File List

Version: 4.56

ReachPhaseImpactSub ImpactLocationLength (ft.)Name 1Value 1Name 2Value 2
M03-02Bridge or CulvertCulvert 0Length60-----0
M03-02Buffers Less than 25 feet Left Bank1180.28-----0-----0
M03-02Cross Section LocationRepresentative 0Number1-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02Debris Jam  0-----0-----0
M03-02EncroachmentBermOne Side356.82Height2-----0
M03-02Erosion Left Bank47.11Height3-----0
M03-02Erosion Left Bank76.13Height2-----0
M03-02Erosion Left Bank110.02Height4-----0
M03-02Grade ControlLedgeNo Picture0Height4HtAbvWater4
M03-02Grade ControlLedgeNo Picture0Height1HtAbvWater1
M03-02Grade ControlLedgePicture0Height5HtAbvWater5
M03-02Gully  0Height30Length400
M03-02Mass Failure Right Bank16.8Height8-----0
M03-02Mass Failure Right Bank39.4Height10-----0
M03-02MigrationFlood Chute 0-----0-----0
M03-02Steep Riffle or Head CutHead Cut 0-----0-----0
M03-02StraighteningStraightening 624.4-----0-----0
M03-02Stream CrossingStream Ford 0-----0-----0